18
15) take the hand wheel off the pto shaft and place it in its non
working position pict 5 pos 14
3. PREPARATION OF THE MACHINE TO WORK ON THE FIELD
CONTROLS TO BE DONE:
1)
Control the gear box oil level and, if needed, add the Sae 90 oil till the window level
2) Lubricate the machine using any
greasing point on the machine
(look at the symbol page 3) and also
the hole of the lever pos 6 pict 2 and
the hole of the disengagement pos 18
pict 7. It’s necessary to lubricate
every 50 working hours.
3) Check the machine tire pressure: 5 bar (70 psi)
3.1 MACHINE SET UP ON THE FIELD
Attention: always work with the working gloves!!
1)
To hook the machine to the tractor, lift it a bit by turning the front jack handle. Then, lift up
the front laterla galvanized stabilizers as much as possible and lower the chassis till when the
complete weight is held by the tractor. Take the front jack off and shift the machine till the
working line (max transport speed is 10 km/h or 6 mph on flat roads).
2) Lift up the chassis a bit by turning the front jack handle and move a bit forward the tractor; adjust
the galvanized legs height to get the chassis horizontal and then lower the front jack by turning the
handle.
Summary of Contents for Silver Series
Page 5: ...5 ...