FG5000/FG10000 Flywheel Grinder
Copyright © 2018, by Irontite Products Inc.
9
800-553-5953
All Rights Reserved Rev. 181102
Figure 4
Figure 3
Figure 2
Figure 1
MACHINE SET-UP
1. Remove protective covering from around machine.
Remove bolts from four corner pads to free machine from
skid. Remove all tooling packages from machine and set
aside. Using the fine feed hand knob, raise the grinding
head motor off the wood shipping block and discard.
Unlock the grinding head column lock handle (Figure 1)
and swing the grinding head motor so it is centered over
the table. Relock the motor flange.
2. A forklift is recommended for removing the machine from
the skid and setting in place. Lift only from the base
cabinet
from the rear
(Figure 2).
3. Locate machine in desired area. Install leveling bolts, lock
nuts and leveling pads in each corner of the machine
(Figure 3). Place a level on the table (Figure 4). Level the
machine side-to-side and front to back adjusting the four
leveling bolts. This is best done by leveling diagonally in
parallel with the corners of the cabinet. Tighten lock nuts
when level.
IMPORTANT:
The machine
MUST BE LEVEL
to operate
correctly and on solid ground.
4. Remove rust preventative from machine using an
approved commercial solvent.
Rear