
45
Assembly Instructions
Tools Needed
•
(2) Adjustable
Wrenches
•
Pliers
Step 7 – High Pressure Supply Hose
•
Rotate splitter to vertical position and latch the vertical latch.
•
Remove plastic plug from pump outlet with pliers (plastic plug is the
outer most fitting).
•
Apply thread sealant to hose threads on only one end of the hose.
Screw hand-tight High Pressure Supply Hose end with thread sealant
applied into the pump outlet.
•
Wrench-tighten the fitting to 1.5-3.0 Turns Past Finger Tight position.
Properly assembled fittings total thread engagement should be 3.5-6
turns.
•
Route hose around the tow bar as shown.
•
Screw finger-tight remaining end of the High Pressure Supply Hose to
the Valve Inlet Fitting on the control valve inlet.
•
Wrench-tighten the fitting.
Valve Inlet
Fitting
Pump
Outlet