Disassembly Instructions
35
Crate Contents:
Log Splitter, Dismounted Valve Assembly, and Manual Bag.
Tools needed: Side cutters, hammer, crowbar, and nut driver.
1. Cut zip tie securing towbar to packaging with side cutters.
2.
Pull jack latch and
swing jack down.
Crank jack down until the weight of splitter rests on the jack instead of on the
package
.
3.
Remove lag bolts.
Remove lag bolts from metal bands on ends of package with nut driver. Metal bands
will come off with bolts.
4.
Use a hammer and crowbar to remove boards from package, starting at the top and working down to the
bottom.
Pull jack latch
and swing jack
down.
Summary of Contents for BH2W2016GX
Page 2: ...Hazard Signal Word Definitions 2...
Page 6: ...Safety Label Location 6 1 2 3 4 5 6...
Page 28: ...Parts Breakdown Exploded View Rev A 28 Fig 05 6 7 8 7 6 6 6 8 6 1 6 8 6 1 6 7...
Page 36: ...Assembly Instructions 36 Manual Bag Contents...
Page 40: ...40 This page has intentionally been left blank...