UM122TW
/
UM622TW
UDM10012
40
O
PERATING
I
NSTRUCTIONS
4. Speed of Raising of Top Tape Head Box
If the Top Tape Head box slams when it reaches its apex or ascends to quickly the flow controls
at the top of the side cylinders need to be adjusted (
Figure-31
). Using a flat head screwdriver,
turn clockwise to slow the ascent and counter-clockwise for a faster ascent. Both cylinders
should be adjusted the same amount and should be done 1/8 of a turn at the time.
5. Drive Base Adjustment
Speed of closing and opening:
The Flow Control Valves at each end of the drive base cylinder under the machine controls the
speed of closing and opening of the drive base. Using a flathead screwdriver, turn clockwise to
slow the movement of the drive bases and counter-clockwise for a faster movement. This
adjustment is to be done 1/8 of a turn at a time. The flow controls regulate the flow of the air
exiting the cylinder.
For Heavy cases:
If drive bases do not close completely to power the case during processing, increase air
pressure on the “Drive Base – Closed” regulator (
Refer to Page 29
). The air pressure should be
increased by 5 PSI at a time by turning the knob clockwise until the box can be centered by the
drive bases. Different types of boxes may require slightly different adjustments than those that
are factory-preset.
For fragile cases:
To prevent the drive bases from closing too quickly and too hard on fragile boxes, the air
pressure regulator and flow controls can be adjusted as necessary.
Figure-31
Flow Control
Adjustment
Flow Control
Adjustment
Summary of Contents for RSA 2024-SB
Page 1: ...RSA 2024 SB Serial Numbers TM122 or TM622 XX X XXX RANDOM SEMI AUTOMATIC CASE SEALER...
Page 2: ...UM122TW UM622TW UDM10012 2...
Page 54: ...UM122TW UM622TW UDM10012 54 ELECTRICAL SCHEMATIC DIAGRAM...
Page 55: ...UM122TW UM622TW UDM10012 55 ELECTRICAL SCHEMATIC DIAGRAM CONT D...
Page 56: ...UM122TW UM622TW UDM10012 56 ELECTRICAL SCHEMATIC DIAGRAM CONT D...
Page 58: ...UM122TW UM622TW UDM10012 58 PNEUMATIC SCHEMATIC DIAGRAM...
Page 59: ...UM122TW UM622TW UDM10012 59 LADDER LOGIC...
Page 60: ...UM122TW UM622TW UDM10012 60 LADDER LOGIC CONT D...
Page 61: ...UM122TW UM622TW UDM10012 61 LADDER LOGIC CONT D...
Page 62: ...UM122TW UM622TW UDM10012 62 LADDER LOGIC CONT D...
Page 63: ...UM122TW UM622TW UDM10012 63 LADDER LOGIC CONT D...
Page 64: ...UM122TW UM622TW UDM10012 64 LADDER LOGIC CONT D...
Page 65: ...UM122TW UM622TW UDM10012 65 LADDER LOGIC CONT D...
Page 66: ...UM122TW UM622TW UDM10012 66 LADDER LOGIC CONT D...
Page 67: ...UM122TW UM622TW UDM10012 67 LADDER LOGIC CONT D...
Page 68: ...UM122TW UM622TW UDM10012 68 LADDER LOGIC CONT D...
Page 69: ...69 APPENDIX A PARTS LISTS UM122T UM622T...
Page 70: ...70 UM122T UM622T...
Page 71: ...71 UM122T UM622T...
Page 72: ...72 2 10 3 7 6 11 16 17 19 23 1 12 15 14 13 5 8 20 18 21 22 4 9 USM7563...
Page 74: ...74 1 2 3 8 19 11 5 4 13 14 10 15 17 12 9 6 7 15 18 16 UAM0298...
Page 78: ...78 9 4 1 5 3 6 7 13 2 11 12 10 8 19 17 18 14 16 15 UAM0312 UAM0300...
Page 80: ...80 4 6 5 1 5 6 3 8 7 8 2 UAM0301 UAM0302...
Page 82: ...82 3 4 6 7 8 2 1 5 9 10 UAM0275...
Page 84: ...84 9 10 7 2 3 5 6 4 1 8 UAM0318...
Page 86: ...86 2 9 1 11 10 4 7 3 6 8 5 USM8090...
Page 90: ...2 1 4 1 3 6 7 8 5 13 9 11 12 10 UAM0322 90...
Page 92: ...92 DRIVE SECTION MOTORS 3 2 4 8 9 10 13 11 12 4 5 6 7 1 USM0808...
Page 94: ...94 11 4 12 13 1 2 1 5 3 10 6 9 7 18 17 16 15 14 10 9 8 4 19 20 21 22 UAM0295...
Page 96: ...96 1 7 9 8 4 5 6 3 8 11 2 8 9 19 16 12 14 17 18 10 11 15 9 13 USM1208...
Page 98: ...98 1 11 10 9 5 6 7 4 3 9 10 11 9 10 8 12 2 USM1210...
Page 100: ...100 2 29 12 5 11 18 28 21 10 7 6 24 25 14 13 17 27 26 3 22 23 8 9 15 1 4 20 16 19 18 USM0811...
Page 102: ...102 2 29 6 22 1 3 23 13 15 14 16 28 27 18 9 5 24 8 21 7 25 10 11 26 20 12 4 19 18 17 USM0812...
Page 104: ...104 8 9 7 5 2 11 10 12 13 6 3 4 1 UAM0305...
Page 106: ...106 8 2 12 10 11 13 6 3 4 5 7 9 1 UAM0306...
Page 108: ...108 1 2 6 6 9 8 3 4 7 5 USM0816...
Page 114: ...114 3 4 1 9 2 13 7 8 12 11 10 6 5 UAM0321...
Page 115: ...115 UAM0321...