8
Connecting the Batteries
1. Place the batteries in the machine oriented as shown in diagram.
2. Connect the batteries as shown in the battery connection diagram
.
3.
DANGER! Incorrect connection of batteries can
cause explosion and/or serious injury.
4. Double check battery connections.
5. Connect the battery pack plug to the machine.
Installing Steel Skirt
1. Lift the deck upward about 90 degrees by pulling up on the front of the deck. At this point, the
tilt latch
will hold the deck in the pad change position. (Ref. Machine Operation - Installing/Changing
Burnishing Pad)
2. Remove steel skirt from bubble wrap packing and on the out
side of the skirt, loosen the 1/4”
hex bolt with jam.
3. Slide the skirt onto the burnish head aligning the slots in the skirt with the tabs on the deck.
Make sure the 1/4" bolt is at the back of the shroud.
4. Tighten the 1/4" bolt until the skirt is snug around the deck but also floats up and down freely.
5. Tighten jam nut and lower deck to burnish position. (Ref. Machine Operation: Installing /
Changing Burnishing Pad)
Summary of Contents for BB20N
Page 4: ...4...
Page 9: ...9...
Page 13: ...13...
Page 18: ...18...
Page 19: ...19...
Page 20: ...20...
Page 22: ...22 Electrical Schematic Non Traction...
Page 23: ...23...
Page 24: ...24 Connections Non Traction...
Page 26: ...26...
Page 28: ...28 Sub Assembly...
Page 30: ...30 Final Bottom Assembly Non Traction...
Page 32: ...32 Final Bottom Assembly Traction...
Page 34: ...34 Final Rear Assembly...
Page 36: ...36 Final Top Assembly...
Page 38: ...38 Final Front Assembly...
Page 40: ...40...