- -
6
Figure 3
3.Steps of installation
3.1 As Figure 4 shows, please remove the outer cover and take out it;
3.2 Please set the dome protocol and baud rate, also check the address of the dome.
3.3Please fix the outer cover, and ensure the tightness of waterproof seals.
3.4 Please fix the vehicle shock-absorb to the bottom basement of the dome, and fix the whole
dome.
3.5Please connect the air socket outline in accordance with the connection wire color of the
diagram correctly.
Figure 4