- -
7
VI. System control wires as figure shows
VII. To Ensure a Smooth and Successful Installation, You Should:
1
、
Have electrical work to comply with latest national electrical code, national fire code,
and all applicable local codes and ordinances.
2
、
Coordinate with other trades to avoid interference.
3
、
Verify existing conditions on the site and coordinate with owner side to ensure
necessary utilities available.
4
、
Copy all related plans, specifications, shop drawings and attachments to schedule and
coordinate related work.
5
、
Thoroughly review the project to ensure that all jobs should meet or exceed the above requirements.
Contact with the CCTV Project Coordinator to draw attention in case alleged discrepancies occur.
VIII. Technical data table.
1
、
Main technical data table of high speed dome camera.
Power supply
DC12V 50/60Hz 2.5A
Power consumption
18W Heater
:
6W
Preset position
25
5
Zoom-rotation interaction
The dome will adjust the manual control speed automatically
according to the current zoom.
Auto overturning
The camera will rotate 180°automatically, when it reaches the
vertical position.
Pan scanning
360°programmable
Cruising track
8
Pan speed(Max)
300°/S
Pan running speed
0° -- 220°/S
Pan range
360°continuously
Tilt range
PTZ
:
-20—90° Dome
:
-95°-- 95°
Tilt speed(Max)
120°/S