1. Electrical installation has been carried out according to unit wiring diagram and the Supply Authority
Regulations.
2. Correct size fuses or circuit breaker installed at switchboard.
3. Supply voltages as specified on unit circuit diagram.
4. All terminals right.
5. Wiring clear of or protected from pipework and sharp edges.
HYDRAULIC CHECKS
HYDRAULIC CHECKS
HYDRAULIC CHECKS
HYDRAULIC CHECKS
HYDRAULIC CHECKS
1. Check that the external water circuit components (pumps, user equipment, filters, expansion tank and
reservoir if supplied) have been correctly installed in accordance with the manufacturer’s recommendations
and that the water inlet and outlet connections are correct.
2. Check that the hydraulic circuit is filled correctly and that the fluid flows freely without any signs of leaks
or air bubbles. When ethylene glycol anti-freeze is used, check that the concentration level is correct.
3. Check the direction of rotation of the pump and leave the fluid to circulate for at least 12 hours for each
pump. Then clean the pump inlet water filter.
4. Adjust the water flow in order to comply with the specifications.
5. Check that the water quality complies with the indicated standards.
6. Check that the oil heating resistances have been energised for at least 12 hours.
VISUAL CHECK
VISUAL CHECK
VISUAL CHECK
VISUAL CHECK
VISUAL CHECK
1. Clearance around unit including condenser air entry and discharge and service access.
2. Unit mounted as specified.
3. For loose or missing bolts or screws.
4. For refrigerant leaks in connections and components.
DUCTING
DUCTING
DUCTING
DUCTING
DUCTING
1. Connections flexible type, secure and detachable for service access.
2. Seams and joints airtight.
3. Fan drive
Pulley adjustment correct for expected air quantity and static pressure.
Belt tension correct.
4. Check that the Biloc Sheaves on both the fan shaft and the motor are correctly fitted to the bush and
rotate without wobble.
5. Ensure that the motor is securely bolted to the mounting plate square to the fan shaft.
6. Using a string line or straight edge ensure that the pulley grooves are correctly aligned.
7. Improper alignment of the pulleys and belt may cause vibration in the fan drive and result in premature