INVT BD100KTR-P Manual Download Page 27

 

26 

6.5.2 Installation Of Lower Fender  

BD 30-150kW-P inverters have lower fencing boards at the bottom of front, back, left and 
right. They are packaged and placed at the bottom of the packaging box. Before installation, 
all lower fencing boards of the inverter must be removed and put out. After the inverter is 
positioned and the screw is locked, the lower fencing boards shall be installed. Dust-proof 
cotton is installed in the lower fencing board, which can not be lost during installation.  

 

Figure 6-3 Installation of lower fender 

6.6DC Side Wiring 

6.6.1 Battery Connection 

The DC-side connection of batteries connected to this series inverters is shown in Table 6-5 
below.             

Battery voltage access range is 400V ~ 850V. For a single BD 30-150kW-P inverter, the 
power should not exceed 1.05 times the rated power. When connecting, users need to 
access at least 50mm² input lines per channel. The energy storage inverter has left many 
terminals for users. Refer to Section 6.5 for the access location of copper bars. 

 

Table 6-5 DC-side wiring correspondence 

BAT+ 

Connect to positive battery pack 

BAT- 

Connect to battery pack negative pole 

GND 

Earthing 

 

6.6.2 The DC Side Wiring Steps Are As Follows: 

Step 1:

 Verify that all terminals of the inverter have been powered off with a multimeter.             

Step 2:

 Identify the positive and negative poles of the cable and mark them well.             

Step 3:

 Connect the positive and negative poles of the battery pack to the "BAT+" and "BAT-

" terminals. 

 

In order to avoid personal and equipment injury, wiring must be carried out without        

electricity.             

 

DC switch is off.             

 

Multimeter is used to measure that the DC side wiring row is not live. 

 

 

DC input voltage limit. Confirm that the DC input voltage should not exceed 850VDC! 

Left lower 

panel 

M5 * 12 screws 

Dash 

Panel 

DANGER 

Summary of Contents for BD100KTR-P

Page 1: ...BD 30 150kW P Inverter User Manual...

Page 2: ...tions 7 2 9 Product Scrapping 8 2 10 Other Considerations 8 3 Product introduction 9 3 1 Product Appearance 9 3 2Main Power Topology 9 DC AC Inverter Contactor DC DC MPPT Controller 1 PV Array 1 PV Ar...

Page 3: ...er Panel 25 6 6 DC Side Wiring 26 6 7 AC Side Wiring 28 6 8 System Grounding 28 6 9 Installation Is Complete 28 7 Test Run 29 7 1 Pre Boot Check 29 7 2 Start Up Operation Flow 30 7 3 Shutdown Operatio...

Page 4: ...mation installation instructions operation maintenance and troubleshooting Before installing and debugging or running any equipment the user must read and understand all the instructions contained in...

Page 5: ...the manual to emphasize or supplement the content It may also provide tips or tricks for optimized use of the product which can help you solve one problem or save your time Please pay attention to the...

Page 6: ...e and overhaul of energy storage inverter it is necessary to avoid incorrect operation or accidents when personnel are close to each other Please observe the following In order to prevent mis closing...

Page 7: ...tic hand rings 2 4 3 Notes for Energy Storage Batteries There is a fatal high voltage between the positive and negative electrodes of the energy storage battery pack connected with the energy storage...

Page 8: ...peration of energy storage inverter These parameters can only be modified after reliable analysis and evaluation of the operation status of the system and energy storage inverter Using inappropriate p...

Page 9: ...nsulating shoes and scald proof gloves If installation site of energy storage inverter is remote emergency rescue facilities should be considered in the event of an accident Use all necessary suppleme...

Page 10: ...n be used to turn off the energy storage inverter only in a fault scenario If the emergency shutdown button is not properly used it can cause damage to the energy storage inverter If the emergency shu...

Page 11: ...C MPPT Controller N Input CB N SCR 3 3 Communication Solutions 3 3 1Communication Scheme of Upper Computer The energy storage inverter communicates with the host computer through RS485 RS232 inverter...

Page 12: ...3 3 BMS Communication scheme Through CAN RS485 communication line energy storage inverter can communicate with BMS to realize data transmission CAN RS485 PCS Figure3 8 BMS transmits data through CAN...

Page 13: ...nt power will export to the public grid 4 1 2 Self use with generator when the SOC of battery is normal Battery and PV supply the load together the generator is off PV power load PV power load when SO...

Page 14: ...re is less than 105 C When the junction temperature of IGBT is higher than 105 C the IGBT will be operated at a set power percentage 4 2 2 Cooling System Start Up The air cooled system will start auto...

Page 15: ...ed from the battery power grid or load In the fault state the system always monitors whether the fault is eliminated or not If the fault is not eliminated the system maintains the fault state If the f...

Page 16: ...equires simultaneous operation of at least two qualified personnel and all electrical installations must conform to local electrical installation standards When installing do not touch other parts of...

Page 17: ...ipper 1 pcs Crimping pliers 1 pcs Bolt driver 1 pcs Sleeve 1 pcs multimeter 1 pcs Screws nuts gaskets Some 5 3 4 Installation Environment Requirements Before installing the inverter please confirm the...

Page 18: ...tion environment Pay attention to damp proof avoid the inverter being rained or damped 5 4 2 Forklift Transportation The following is a sketch of using forklift trucks to transport with or without pac...

Page 19: ...18 Figure 5 2 Packaged Handling Figure 5 3 Unpackaged Handling...

Page 20: ...meeting fire protection requirements The volumetric space reserved size is shown in the following figure 5 5 2 Dimensions of Various Models The mechanical dimensions of each type of BD 30 150kW P inv...

Page 21: ...ilation condition and low air flow It can get more ventilation by increasing construction measures such as air supply grille or fan Sufficient air intake should be provided at the intake port Air qual...

Page 22: ...d be inclined downward rainproof Protection should be added to the outlet of the air duct rodent and bird control etc The air required by the inverter is inhaled through the bottom vent and the dust n...

Page 23: ...22 Figure 5 12 500 kW 630 KW Vent Size...

Page 24: ...s for the inverters Type capacity Type capacity Zero line Ground wire Positive and negative DC input per pole 30KW 25 2 3 25 2 16 2 input 50 2 50KW 35 2 3 35 2 16 2 input 70 2 100KW 50 2 3 50 2 25 2 i...

Page 25: ...al C screw D Spring washer E Large pad F Nut 6 3 Wiring Specification When laying cables communication lines and power lines should be laid separately DC and AC circuits need to be laid separately and...

Page 26: ...l during construction Therefore it is suggested that the power circuit should be connected first and then the connection should be made When connecting the cable should be grooved as far as possible W...

Page 27: ...5 times the rated power When connecting users need to access at least 50mm input lines per channel The energy storage inverter has left many terminals for users Refer to Section 6 5 for the access loc...

Page 28: ...uality assurance Fixed screw and other parts used for wiring have been installed at the corresponding wiring terminals when the equipment is delivered Need to check the material of the external termin...

Page 29: ...phase of the power grid to the inverter according to Table 6 6 Step 4 If it is an off grid integrated model connect the cables according to Table 6 6 and Table 6 7 6 8 System Grounding The grounding...

Page 30: ...ter The inverter needs to be checked before it is turned on Check the installation and wiring of the inverter according to Chapters 5 and 6 Ensure that all AC and DC circuit breakers are disconnected...

Page 31: ...ge inverter before starting the equipment must be thoroughly and meticulously checked to ensure that all indicators meet the requirements before starting 7 2 Start Up Operation Flow After all of the a...

Page 32: ...ter is turned off the DC side circuit breaker or load switch of the inverter is manually disconnected so that the switch is in the OFF position Step 3 Disconnect inverter fan switch auxiliary power sw...

Page 33: ...AC side circuit breaker Step 3 Reset the EPO button after confirming that the danger or fault has been removed and needs to be operated Emergency shutdown button is only used in case of machine failur...

Page 34: ...set the parameters of the inverter The touch screen interface is shown in the following figure Figure 8 1 LCD Appearance Table 8 1 Regional Function Description Functional area Explain Basic Informat...

Page 35: ...curs in the inverters the alarm sounds are emitted 8 3 Communication Settings Communication parameters can set device address modbus address and RS485 baud rate to communicate with the host computer T...

Page 36: ...in Interface 1 Click on the Battery icon on the main page to view battery properties 2 Click on the inverter icon to view real time data 3 Click on the triangular Warning sign in the lower right corne...

Page 37: ...d alarm 3 Record Data Report Charge and discharge statistics Export Data Export history and operation records History Record Display historical alarm records Operation Log Records generated by system...

Page 38: ...me alarm Users can monitor the inverter by observing the feedback of these three real time quantities The state interface is shown in Figure 8 4 Figure 8 4 Status Menu Interface 8 4 3 Introduction to...

Page 39: ...eed to export History or Operation Log After the guide is finished click Eject U disk Figure 8 6 Record_Export Data 8 4 4Introduction to System Settings Menu In this menu interface you can click Gener...

Page 40: ...password interface will pop up The password is 123 The interface can select general settings such as inverter working mode and battery charging and discharging mode Figure 8 8 System_General Settings...

Page 41: ...40 Figure 8 9 System_System Settings...

Page 42: ...to the local electricity price difference or the actual peak valley power consumption time Figure 8 10 System_Time Settings 8 4 5 Switch Menu Click on the switch button to enter the inverter switch in...

Page 43: ...42 Figure 8 11 Switch menu...

Page 44: ...uration of energy storage batteries and network parameters Communication connection scheme of energy storage inverter Fault information and brief description 9 2 Matters Needing Attention 9 2 1 Genera...

Page 45: ...year Duct cleaning Check duct dust Listen to if there is any abnormal vibration when the fan is running Use compressed air and turn on the fan for cleaning Clean or replace the air filter Half a year...

Page 46: ...nts When replacing the electronic and electrical components in the energy storage inverter be sure to replace the same type of components from the same manufacturer The type of components can be obtai...

Page 47: ...n adapter and try again Check whether the local address and baud rate are consistent with the host computer LCD screen cannot be switched on and off Check the communication connection between LCD scre...

Page 48: ...Turn off check AC and DC auxiliary power supply board Inverter overcurrent Turn off check whether the input and output of the inverter are short circuit or whether the inverter is overloaded Wave by W...

Page 49: ...oltage quickly and react Over Under Frequency Protection of Power Grid When the energy storage inverter detects that the frequency fluctuation of the power grid exceeds the allowable range the energy...

Page 50: ...pendent inverting mode and detects that the three phase output voltage exceeds the allowable voltage range the energy storage inverter will stop working and send out warning signals and display the fa...

Page 51: ...erating state of the energy storage inverter is standby grid connected or off grid the AC DC main contactor is detected to be disconnected the energy storage inverter will stop working and send out wa...

Page 52: ...leading 0 8 lagging Grid connection type 3W N PE Isolation transformer yes AC output parameters off grid Rated output power 33kVA 55kVA 110kVA 165kVA 275kVA 550kVA Active power 30kW 50kW 100kW 150kW 2...

Page 53: ...52 Altitude 5000m Derating above 3000 m Dimension W xH x D 800 x 1900 x 800mm 1200 x 2050 x 800mm 1800 x 2050 x 800mm 2800 x 2050 x 1050mm Weight 440kg 720kg 900kg 1250kg 1700kg 3520kg...

Page 54: ...modification or use Operating in very harsh environments beyond those described in this manual Machine failure or damage caused by installation repair alteration or disassembly by non company service...

Reviews: