DANGER!

Risk of death by electrocution!

Correcting the phase relation at the control box 

may only be carried out by a qualified electrici-

an!

3 .4  Initial commissioning

Switch on, set the language and time. See 

„Display“, p. 19.

4  Controls

4 .1  Switches and Keys

3

1

4

5

2

6

000119

1

Key selector switch

2

Main switch (emergency stop)

3

Start button, green

4

Reset button, yellow

5

Stop button, red

6

Display

fig. 7  Controls

1

 = Key selector switch

a) Left: manual operation

The „Manual operation“ screen appears. Manual con-

trol of the machine via the display.

b) Middle: lock

The machine can be locked and thus secured against 

unauthorised use. When the main switch is on, the 

start screen appears.

c)  Right: automatic mode

The “Automatic mode” screen appears.

2

 = Main switch (emergency stop)

This switch is used to switch the machine on and off 

(position “1” or “0”).

3

 = Start button, green

Only in automatic mode:

When this button is pressed, the shredder‘s cutting me-

chanism and conveyor belt start running and the ma-

chine can be loaded.

4

 = Reset button, yellow

Only in automatic mode:

Press the button as instructed on the display.

5

 =  Stop button, red

Only in automatic mode:

When this button is pressed, the shredder is switched 

off and the cutting mechanism and conveyor belt are 

stopped.

6

 = Display

All other information is entered and output via the dis-

play (settings, control, status messages, error messages).

NOTE!

To avoid display damages from scratches and 

cracks put tools and the like out of your hand be-

fore operating.

4 .2  Display

Four main screens (fig. 7/6) are used to control the machine.

NOTE!

The display contains various buttons, fields and il-

luminated displays:

Circular: illuminated information display

Rectangular: text output field

Rectangular with 3D effect: input button

Summary of Contents for 16.99 SmartShred

Page 1: ...ompacteur con compactador 16 99 SmartShred mit Austragsband with discharge conveyor avec bande de d charge con cinta de descarga Betriebsanleitung D Operating Instructions GB Instructions d op ration...

Page 2: ...olls 26 7 Malfunction 27 7 1 Motor faults 27 7 2 Fault checklist 27 8 Maintenance Disposing 27 8 1 Gear box maintainance 27 8 2 Energy saving tip 27 8 3 Checking the oil level 27 8 4 Disposing of the...

Page 3: ...tch covers fig 2 1 2 Fix the limit switch S8 with 2 screws M4x40 and nuts M4 below the switch cam of the switch flap fig 2 8 Undo the threa ded pin fig 2 9 Allen key 2 5 mm turn the cam into position...

Page 4: ...e 1 3 2 4 000133 1 Strap roll holder 2 Strap roll 3 Dividing panel 4 Switch cabinet fig 5 Strap rolls 3 Initial start up 3 1 Application CAUTION Risk of injury Damage to the cutting mecha nism The shr...

Page 5: ...gency stop This switch is used to switch the machine on and off position 1 or 0 3 Start button green Only in automatic mode When this button is pressed the shredder s cutting me chanism and conveyor b...

Page 6: ...tton fig 9 Date Time screen Automatic mode main screen fig 10 The Automatic mode screen appears when the main switch is switched on and the key selector switch is turned to the right 1 2 3 4 5 6 7 8 0...

Page 7: ...s stopped b Open Discharge Flap If the key is pressed and held for at least 2 seconds the baling ram travels a short distance in reverse and the locking lever fig 20 2 is advanced a short dis tance pr...

Page 8: ...per up to about 550 sheets depending on the type and size of paper and also crumpled paper and card board Place any material to be shredded on the moving conveyor belt which feeds it to the cutting sy...

Page 9: ...achine on again and continue shredding 1 2 3 000418 1 Conveyor belt housing 2 Handle 3 Cover flap fig 16 Emptying the conveyor belt housing NOTE The machine can only be started when the cover flap fig...

Page 10: ...and discharge flaps are open The bale can be ejected in three different ways and then removed A Tie off and eject into plastic sack for small particles fig 9 10 11 12 and 13 B Tie off and eject witho...

Page 11: ...et flap and open the discharge flap 2 Press the bale into the plastic sack and onto the dischar ge flap fig 21 by activating the Advance Ram key fig 13 1 3 Fold the end of the sack together and seal w...

Page 12: ...n the inlet flap and remove both strap lifters fig 24 1 3 Open the strap brake fig 17 4 Insert the strap rolls fig 25 2 in to the strap roll holder fig 25 1 as shown with the strap ends pointing down...

Page 13: ...rd positi on Pull red bar at table forward is there a paper jam in the machine Follow the instructions for Automatic response in case of overloading p 22 are the inlet flap fig 1 5 and the discharge f...

Page 14: ...parts 10 Technical data Shredder Cutting size 10 x 70 mm 6 x 50 mm Cutting capacity in zwei Stapeln 10 x 70 mm 470 520 sheets 70g m2 6 x 50 mm 300 330 sheets 70g m2 Working width 500 mm Power 11 5 kW...

Page 15: ...24 10 are connected in the dummy plug a Schaltplan angepasst J nger 11 05 2017 Main Switch 1 2 3 4 5 6 Q1 63A Hauptschalter L1 X1 L2 L3 PE U1 V1 W1 PE M1 7 5kW 9 0 3 M 1 2 K1M 11 0 32A 3 4 5 6 1 2 K2...

Page 16: ...1 nderung 0 7 6 Gepr Ersatz von 8 9 3 5 4 25 06 2019 intimus International GmbH 4 2 Name 5 2 17 100 240VAC 24VDC 5A 24 28 8VDC U_Out ABL 8REM24050 TELEMECANIQUE a Schaltplan angepasst J nger 11 05 201...

Page 17: ...DE E0 6 I6 DE E0 7 I7 8 8 Drehgeber rotary encoders COM2 DE E1 0 I8 DE E1 1 I9 13 3 Optional Schwimmerschalter ler Optional float switch oiler DE E1 2 I10 Wicklungsschutz Presse optional Wicklungsschu...

Page 18: ...11 TB1 S11 S12 TB1 S12 S22 TB1 S22 S42 TB1 S42 S21 TB1 S21 S41 TB1 S41 S39 TB1 S39 11 12 K1M 11 0 11 12 K2M 11 1 A1 A2 9A K11M 1 2 6 8 3 4 6 8 5 6 6 9 12 11 6 6 5 6 K11M 6 8 3 4 K11M 6 8 1 2 K11M 6 8...

Page 19: ...derung 0 7 6 Gepr Ersatz von 8 9 3 8 4 15 03 2022 intimus International GmbH 7 2 Name 5 5 17 a Schaltplan angepasst J nger 11 05 2017 X2 14 0 24 11 12 15 1 14 13 18 20 X1 47 48 49 50 51 52 53 54 A1 A2...

Page 20: ...Automatic E0 0 5 1 I1 DE S2 24 Hand Manually E0 1 5 1 I4 DE A1 S4 12 Stop E0 4 5 2 I3 DE S3 14 Start E0 3 5 1 11 12 S4 Stop 13 14 S3 Start BN BK BU B1 Drehgeber rotary encoders I7 DE B1 BK Drehgeber...

Page 21: ...14 Taster Vor Presse Button forward baler E5 2 6 1 5 K16 14 Taster Zur ck Presse Button Back baler E5 3 6 1 6 K17 14 Taster Stop Presse Button stop baler E5 4 6 1 X1 9 X1 10 57 58 59 60 95 96 F2 3 6...

Page 22: ...14 Pressdruck erreicht Presse Press pressure reaches E5 7 6 1 10 K21 14 Ballen fertig Presse bales finished E6 0 6 1 X2 6 8 7 X1 61 63 64 A1 A2 K19 230V 14 11 10 2 A1 A2 K20 230V 14 11 10 3 A1 A2 K21...

Page 23: ...6 6 22 21 11 0 A1 A2 K3M 18A A1 A2 K4M 32A A1 A2 K5M 9A 1 2 3 6 3 4 3 6 5 6 3 6 A1 A2 K6M 12A 14 13 7 3 21 22 7 3 X2 2 3 DA Q0 Shredder Vorw rts Shredder Forward A1 K1M A1 A0 0 5 2 DA Q1 Shredder R ck...

Page 24: ...er Datum Datum Ersetzt durch Steuerstromkreis Ausg nge Control circuit outputs 1 nderung 0 7 6 Gepr Ersatz von 3 4 15 03 2022 intimus International GmbH 2 Name 5 5 TB2 Optional Zuf rderband Optional f...

Page 25: ...14 4 15 03 2022 intimus International GmbH 13 2 Name 5 11 17 a Schaltplan angepasst J nger 11 05 2017 11 14 K22 13 5 X1 31 X1 32 1 2 M5 ler oiler M 1 33 34 13 14 S7 Schwimmerschalter float switch I9 D...

Page 26: ...Bedienung 1 2 P M2 Aussto klappen ffner Motor M 1 P X1 14 P X1 15 16 17 18 19 X2 7 1 24 18 20 19 6 4 8 7 5 10 16 17 9 12 15 11 14 2 3 1 13 5 P X2 7 P X2 6 P X2 8 12 P X3 14 P X2 9 P X3 4 11 7 1 P X2...

Page 27: ...95663 3 03 22 69 16 99 SmartShred SB No 991 0428 4 a Seite page 13 U1 V1 W1 21 22 PE M4 Motor Abf rderband Motor conveyor belt 3 M X2 21 22 23 PE 19 20 24 10...

Page 28: ...ion 1 0 7 6 8 3 4 05 04 2019 intimus International GmbH 2 5 U1 V1 W1 PE M7 Absaugung suction 3 M 4 TB2 Optional Absaugung Optional suction A3 K12M A1 A2 2 6 3 1 2 K12M 16 4 32A 3 4 5 6 X7 U1 V1 W1 PE...

Page 29: ...48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 F1 F2 F3 F4 Netzanschluss CEKON Power plug 3 phase M1 1 2 3 4 5 6 7 8 9 10 11 12 24 23 22 21 20 19 18 17 16 15 14 13 PE SW BN GR PE PE SW SW BN...

Page 30: ...Seite page 16 Bearb juenger Datum Ubersicht Zus tzliche Klemmen f r Absaugung Overview Additional terminals for dust extraction 05 04 2019 intimus International GmbH PE U1 V1 W1 X7 PE SW BN GR Netzan...

Page 31: ...ichtklemmenplan Schaltkasten Zuf rderband Overview Terminal diagram control box feed conveyor nderung Gepr Ersatz von 15 03 2022 intimus International GmbH Name PE L1 L2 L3 PE U1 V1 W1 1 2 3 4 13 14 1...

Page 32: ...95663 3 03 22 74...

Page 33: ...95663 3 03 22 75 16 99 SmartShred 12 Certificate of Conformity...

Page 34: ...b H Leonard Bernstein Stra e 10 1220 Wien 43 0 1 2583621 0 contact at intimus com Belgium intimus International BeLux Generaal de Wittelaan 17B 2800 Mechelen Belgium 32 0 15 29 46 30 info belux intimu...

Reviews: