AirMaid® 500 W Ozone Generator User Manual
4
PRODUCT WARRANTY
CONTENTS
LIMITED WARRANTY FOR INTERZON’S EQUIPMENT
This warranty is subject to the following terms:
A new product is guaranteed to be free from defects and/or workmanship a period of 3 years from the
original purchase date.
The warranty of a new product covers repair or replacement of the damaged part as well as the delivery of
the product to the customer.
A spare part is guaranteed to be free from defects and/or workmanship for a period of ninety (90) days from
the original installation date.
The spare part warranty covers only repair or exchange of damaged part and does not extend over labour
costs for removing or installing the part, trips or any other costs in connection with the repair or replacement
of the part.
The installation of the product must be carried out according to the installation instructions described in
this manual.
Circumstances that can make the warranty null and void:
1. If a foreign object such as water or cleaning agent has been sprayed on or into the generator;
2. Generator overheating as a result of a blocked inlet or outlet;
3. If the regular generator maintenance has not been performed as described in this manual;
4. If the generator has not been installed according to the instructions in this manual.
A complaint must be filed with the reseller or the manufacturer. No compensation will be granted for
repairs carried out by a third party without Interzon’s consent. In case of damage during transport, please
inform the sender immediately in order to file a complaint.
The limited warranty above does not cover damages caused by accidents, product modifications or incor-
rect use and does not apply if the serial number has been removed or tampered with.
1. Check the Product .................................................... 5
2. System Overview ...................................................... 5
3. Installation Guidelines ............................................ 6
4. Electrical Connection .............................................. 7
5. System Test.................................................................. 7
6. Service and Maintenance....................................... 8
7. Technical Specification ............................................ 9