background image

INSTALLATION INSTRUCTIONS

3-phase R-22 Split System Heat Pump

506 01 5001 00

9

NOTE:

 These are not back-seating valves. It is not

necessary to force the stem tightly against the rolled lip.

The service valve cap is a primary seal for the valve and
must be properly tightened to prevent leaks. Make sure
cap is clean and apply refrigerant oil to threads and
sealing surface on inside of cap.

Tighten cap finger tight and then tighten additional 

6

 of a

turn (1 wrench flat) to properly seat the sealing surfaces.

J. GAUGE PORTS

Check for leaks at the schrader ports and tighten valve
cores if necessary. Install plastic caps finger tight.

ELECTRICAL WIRING

!

WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in per‐
sonal injury or death.

Before installing, modifying or servicing system,
turn OFF the main (remote) electrical disconnect
device. There may be more than one disconnect
device.

Refer to unit rating plate for the required supply voltage.
Depending on the model, required supply voltage will be:

208/230 V, 3-phase, 60 Hz.

or

460 V, 3-phase, 60 Hz.

Outdoor units are approved for use with copper
conductors only. Do not use aluminum wire.

Refer to unit rating plate for minimum circuit ampacity and
circuit protection requirements.

Grounding

Permanently ground unit in accordance with the National
Electrical Code and local codes or ordinances. Use a
copper conductor of the correct size from the grounding
lug in control box to a grounded connection in the service
panel or a properly driven and electrically grounded
ground rod.

Supply Voltage Wiring Connections

Make all outdoor electrical supply (Line Voltage)
connections with raintight conduit and fittings. Most
codes require a disconnect switch outdoors within sight of
the unit. Consult local codes for special requirements.

Route electrical supply (Line Voltage) wiring through
knockout hole in bottom of Control Box.

Connect two power wires to Contactor and one power
wire to Blue lead wire (use wire nut). Connect ground wire
to Ground Lug. Refer to Wiring Diagram on unit and
Figure 11.

Figure 11

208/230 V and 460 V

Electrical Supply

(Line Voltage) Connections

DISCONNECT

PER NEC AND/OR

LOCAL CODES

CONTACTOR

GROUND

LUG

FIELD GROUND

WIRING

FIELD POWER

WIRING

11

13

L1

L3

L2

BLUE LEAD WIRE

Phase Monitor Relay Board

The Phase Monitor Board detects the sequence of the
three phase electrical system, and a relay breaks the Y
(call for cooling) control signal if the phasing is incorrect.
Additionally, the board will detect the loss of voltage on
any of the three phase inputs and break the Y signal in the
same way.

An LED on the board displays the following status:
Red LED ON -

Normal function, relay contact
closed.

Red LED Blinking - Abnormal function, relay contact

open.

Red LED OFF -

No 24 VAC control power present at
board.

NOTE:

 Units with Comfort Alert

t

 Diagnostics device

have phase monitor feature built in.

Figure 12

Phase Monitor Relay Board

Summary of Contents for H2H3 Series

Page 1: ...manner The signal word CAUTION is used throughout this manual in the following manner Signal Words on Product Labeling Signal words are used in combination with colors and or pictures on product labe...

Page 2: ...r runoff will not enter the unit Locate unit away from areas where heat lint or exhaust fumes will be discharged onto unit as from dryer vents Locate unit away from recessed or confined areas where re...

Page 3: ...it System Heat Pump 506 01 5001 00 3 Figure 1 Clearances various examples Wall 6 24 Service Wall Wall Wall 6 6 Post Wall Wall 18 18 18 18 6 6 6 18 18 18 18 24 Service 24 Service 24 Service 24 Service...

Page 4: ...orms that are self supporting and span several load bearing walls These suggestions are to minimize noise and vibration transmission through the structure If the structure is a home or apartment avoid...

Page 5: ...in the field use dehydrated or dry sealed deoxidized copper refrigeration tubing Do not use copper water pipe Do not remove rubber plugs or caps from copper tubing until connections are ready to be ma...

Page 6: ...ION UNIT OPERATION HAZARD Failure to follow this caution may result in improp er product operation Do not bury more than 36 of line set underground Refrigerant may migrate to cooler buried section dur...

Page 7: ...g against inside of piston body 3 Find plastic bag taped to unit containing copper adapter tube with brass nut 4 Install adapter tube against retainer and thread brass nut onto liquid service valve Ti...

Page 8: ...2 4 6 1000 1500 LEAK IN SYSTEM VACUUM TIGHT TOO WET TIGHT DRY SYSTEM 2000 MICRONS 2500 3000 3500 4000 4500 5000 3 7 5 Triple Evacuation Method The triple evacuation method should only be used when sys...

Page 9: ...nces Use a copper conductor of the correct size from the grounding lug in control box to a grounded connection in the service panel or a properly driven and electrically grounded ground rod Supply Vol...

Page 10: ...ircuit Connections LEGEND 24 V FACTORY WIRING 24 V FIELD WIRING FIELD SPLICE CONNECTION OUTDOOR THERMOSTAT EMERGENCY HEAT RELAY SUPPLEMENTAL HEAT RELAY SHR EHR C W 2 L G Y E O R C W 2 L G Y E O R ODT...

Page 11: ...door fan motor lead from OF2 on control board refer to Figure 15 Tape lead to prevent grounding 3 Restart unit in heating mode allowing frost to accumulate on outdoor coil 4 After a few minutes in hea...

Page 12: ...Operate unit a minimum of 10 minutes before checking charge NOTE If outdoor unit has a 2 speed fan motor motor will operate in low speed when outdoor ambient temperature is below 82 F Pull one of the...

Page 13: ...satisfied its contacts open de energizing contactor and blower relay Compressor and motors stop NOTE If indoor unit is equipped with a time delay relay circuit the blower runs an additional length of...

Page 14: ...Stage Compressor Signal First Stage Compressor Signal 24 VAC for Thermostat Indicator 24 Volt Power 24 Volt Common 24 Volt Compressor Protection Function DC Compressor Solenoid ALERT LED TRIP LED DC S...

Page 15: ...estriction 2 If high pressure switch present go to Flash Code 2 information 3 Intermittent thermostat demand signal 4 System or control board defective Yellow ALERT Flash Code 4 Locked Rotor LOCKOUT 1...

Page 16: ...R and C are reverse wired TRIP LED and ALERT LED flashing together Verify R and C terminals are supplied with 19 28VAC ALERT Flash Code 3 Compressor short cycling displayed incorrectly Verify Y termi...

Reviews: