
5
2.
Install the handle brackets on the base unit, using the screws provided.
Base Unit
Rail Guide
Handle Brackets
3.
If the rail guides are already attached to the base unit, skip to step 4. If the rail guides are not
attached to the base unit, do the following:
−
Remove the rail guides from the mounting rails. The rail guide is the innermost-sliding
piece of the mounting rails, and has a flexible tab at one end.
−
Attach the rail guides to the base unit using the flat-head screws provided, making sure
the tab on the rail guide is towards the back of the base unit. Refer to the following
figure.
Flexible Tab
Summary of Contents for StudioZ GT
Page 1: ...GT RAX Systems System Setup April 1999 D1AA00090 ...
Page 6: ...vi ...
Page 28: ...18 ...
Page 78: ...68 ...
Page 88: ......