5
Installing the Power Supplies, Operator Panel, and Input/Output Module
The following instructions show you how to install the components that go in the rear of the
Fibre Channel chassis.
WARNING
Make sure that you wear the anti-static wrist strap included with the Tower Kit
components to avoid damaging the power supplies, operator panel, or I/O module.
See the
SS-1200-FCAL Rack Installation and User Guide for more information.
To install the storage system components:
1. Remove the protective covering from each of the storage system components.
2. Check the power supplies and verify that the voltage switch is set to the correct voltage
(either 115V or 220V) for your country.
3. Turn the storage system around so that you are looking at the back of the unit (see the
previous illustration).
4. Remove the alignment screws and washers located above each side of slots 4 and 1 (see
the previous illustration). These ensure the correct orientation and secure placement of
the power supplies you will install; set these screws and washers aside for now because
you cannot install the power supplies while these screws are in place.