Intergraph Salient Fibre Channel Assembly Instruction Manual Download Page 2

Copyright

 1998 Intergraph Computer Systems.  All rights reserved.  This document contains information protected by copyright, trade secret, and

trademark law.  This document may not, in whole or in part, be reproduced in any form or by any means, or be used to make any
derivative work, without written consent from Intergraph Computer Systems.

Use, duplication, or disclosure by the United States Government is subject to restrictions as set forth in subdivision (c)(1)(ii) of the rights in
technical data and computer software clause at DFARS 252.227-7013.  Unpublished rights are reserved under the copyright laws of the
United States.

Intergraph Computer Systems, Huntsville AL 35894-0001

Notice

Information in this document is subject to change without notice and should not be considered a commitment by Intergraph Computer
Systems.  Intergraph Computer Systems shall not be liable for technical or editorial errors in, or omissions from, this document.  Intergraph
Computer Systems shall not be liable for incidental or consequential damages resulting from the furnishing or use of this document.

All warranties given by Intergraph Computer Systems about equipment or software are set forth in your purchase contract.  Nothing stated
in, or implied by, this document or its contents shall be considered or deemed a modification or amendment of such warranties.

Trademarks

Intergraph Computer Systems

 and the Intergraph Computer Systems logo are registered trademarks of Intergraph Computer Systems.

StudioZ is a trademark of Intergraph Computer Systems.

Other brands and product names are trademarks of their respective owners.

Summary of Contents for Salient Fibre Channel

Page 1: ...Salient Fibre Channel Storage System Tower Assembly Instructions August 1998 DHA024800...

Page 2: ...ocument is subject to change without notice and should not be considered a commitment by Intergraph Computer Systems Intergraph Computer Systems shall not be liable for technical or editorial errors i...

Page 3: ...chassis and make sure you have all the components and then determine which end of the chassis will be the top of the tower unit To unpack and orient the chassis 1 Open the box containing the Fibre Cha...

Page 4: ...cover which is protected by a layer of protective wrap CAUTION All of the tower kit components are contained within the tower kit cover To ensure that you do not scratch the surface of the tower cover...

Page 5: ...on the foot 3 Use two M6 pan head screws and washers to attach the front of the foot to the bottom front of the chassis the pan head screws and their washers are the larger of the two types of screws...

Page 6: ...the rear bracket screws you inserted in step 7 so that they are fully countersunk 10 Turn the unit upside down again and use six M5 countersunk screws to secure the cover to the unit 11 Turn the unit...

Page 7: ...omponents 1 Remove the protective covering from each of the storage system components 2 Check the power supplies and verify that the voltage switch is set to the correct voltage either 115V or 220V fo...

Page 8: ...in the middle column of slot 3 Again make sure that the This Side Up label faces the left of the chassis rear 10 Place the smaller blanking plate CGEN575 over the last column 3 in slot 3 11 Remove the...

Page 9: ...nnel storage system NOTE See the StudioZ GT for SOFTIMAGE DS System Guide for information on this workstation Workstation Requirements StudioZ GT1 base unit Q Logic adapter card CINFE50 Q Logic driver...

Page 10: ...drives and you can purchase four additional drives for each storage system To add an additional Fibre Channel storage system 1 Connect the HSSDC end of the Fibre Channel cable MCBL337 to the Fibre Cha...

Page 11: ...he cable thumbscrews 6 Power up your StudioZ GT1 workstation and turn the keys in each Fibre Channel I O module from Service to Run to power up the Fibre Channel storage systems See SS 1200 FCAL Rack...

Reviews: