![Intergraph Salient Fibre Channel Assembly Instruction Manual Download Page 11](http://html1.mh-extra.com/html/intergraph/salient-fibre-channel/salient-fibre-channel_assembly-instruction-manual_2076553011.webp)
9
4. Using the DB9-to-DB9 cable (MCBL336), connect the Tx port on the first chassis to the
Tx/Rx port on the second chassis.
5. Using the additional DB9-to-DB9 cable (MCBL336), connect the Tx port on the second
chassis to the Tx/Rx port on the third chassis.
NOTE
Make sure that you tighten all of the cable thumbscrews.
6. Power up your StudioZ GT1 workstation, and turn the keys in each Fibre Channel I/O
module from Service to Run to power up the Fibre Channel storage systems. See SS-
1200-FCAL Rack Installation and User Guide for more information on the I/O module.
NOTE
A steady green light appears on each drive when the Fibre Channel storage systems have
powered up properly. If you see an amber light on any drive, make sure that the Fibre
Channel cables (MCBL337) are securely connected.