Intergraph Salient Fibre Channel Assembly Instruction Manual Download Page 6

4

NOTE

Proper placement of the cover depends on the brackets, so do not tighten the back bracket
fully in case you need to adjust it to make the cover fit.

8.  Place the cover over the chassis.  There are two slots, or notches, at the bottom of each

side of the tower cover front; these fit around the flange on the bottom front of the
chassis.  Also, there is a cutout on the inside of the cover at the front and the back.
Make sure that the front and rear brackets fit inside these cutouts.

NOTE

At this point, you may need to adjust the rear bracket to ensure that the cover fits properly.

9.  Finish tightening the rear bracket screws you inserted in step 7 so that they are fully

countersunk.

10.  Turn the unit upside down again, and use six M5 countersunk screws to secure the cover

to the unit.

11.  Turn the unit right side up again.

Installing the Fibre Channel Storage System Components

Now that you have installed the tower foot and cover, you can install all of the components
in the Fibre Channel chassis.  The  SS-1200-FCAL Rack Installation and User Guide
describes each of the components of the storage system in detail.  Installation of these
components is described for a rack-mount system; for example, the slots are referred to in
terms of left to right instead of top to bottom as in a tower configuration.  The following
illustration shows the unit in the tower position with the slots labeled accordingly.

Summary of Contents for Salient Fibre Channel

Page 1: ...Salient Fibre Channel Storage System Tower Assembly Instructions August 1998 DHA024800...

Page 2: ...ocument is subject to change without notice and should not be considered a commitment by Intergraph Computer Systems Intergraph Computer Systems shall not be liable for technical or editorial errors i...

Page 3: ...chassis and make sure you have all the components and then determine which end of the chassis will be the top of the tower unit To unpack and orient the chassis 1 Open the box containing the Fibre Cha...

Page 4: ...cover which is protected by a layer of protective wrap CAUTION All of the tower kit components are contained within the tower kit cover To ensure that you do not scratch the surface of the tower cover...

Page 5: ...on the foot 3 Use two M6 pan head screws and washers to attach the front of the foot to the bottom front of the chassis the pan head screws and their washers are the larger of the two types of screws...

Page 6: ...the rear bracket screws you inserted in step 7 so that they are fully countersunk 10 Turn the unit upside down again and use six M5 countersunk screws to secure the cover to the unit 11 Turn the unit...

Page 7: ...omponents 1 Remove the protective covering from each of the storage system components 2 Check the power supplies and verify that the voltage switch is set to the correct voltage either 115V or 220V fo...

Page 8: ...in the middle column of slot 3 Again make sure that the This Side Up label faces the left of the chassis rear 10 Place the smaller blanking plate CGEN575 over the last column 3 in slot 3 11 Remove the...

Page 9: ...nnel storage system NOTE See the StudioZ GT for SOFTIMAGE DS System Guide for information on this workstation Workstation Requirements StudioZ GT1 base unit Q Logic adapter card CINFE50 Q Logic driver...

Page 10: ...drives and you can purchase four additional drives for each storage system To add an additional Fibre Channel storage system 1 Connect the HSSDC end of the Fibre Channel cable MCBL337 to the Fibre Cha...

Page 11: ...he cable thumbscrews 6 Power up your StudioZ GT1 workstation and turn the keys in each Fibre Channel I O module from Service to Run to power up the Fibre Channel storage systems See SS 1200 FCAL Rack...

Reviews: