14
SC-9216R
SPEAKER LINE CHECKER
8. 1 of 2 Test in progress
These are the 2 display screens that will appear during a test. The first screen indicates the channel currently
being tested along with its reference impedance value. The second screen indicates the result of the test and
the impedance of the line at the moment of the test. The Buzzer will sound continuously once any channel has
failed a test. The BUZZER OFF button may be depressed after all channels have been tested and the Buzzer
cycles on and off.
9. Remote Pause
All functions of the SC-9216R and the SC-9116R expander may be paused by a remote switch (not supplied).
Operation will not continue until the remote has been switched back to the operating position. This is
described in greater detail in the Remote section of this manual.
10. 1 of 4 All Check
ALL CHECK will manually cause a test to occur without waiting for the next scheduled automatic test. One of
the four system configurations (4-1, 4-2, 4-3, 4-4) must be selected though in most applications it does not
matter which one is used. The selection process is described in the Advanced Operation section of this
manual. Selecting 4a is generally suitable.
[7-3]
[7-4]
Fault Found
Service Required
Ch. 24
Line Imp. Low
Fault Found
Service Required
Ch. 30
Line Short
[8-1]
[8-2]
Test in
progress.
Ch. 1, Ref=XXX
Line Normal
Test in
progress.
Ch. 1, New=XXX
Ground Fault
[10-1]
[10-2]
To test
ALL CHANNELS
press ENTER.
(Spk W x 70V)
To test
ALL CHANNELS
press ENTER.
(Spk W x 100V)
[9-1]
Operation paused
by remote.
Resume operation
by remote.
[7-5]
Fault Found
Service Required
Ch. 32
Ground Fault