I N S T A L L A T I O N M A N U A L
W I L D R I D E ™ S L I D E
10
WRS-IM Rev. 7/08 (SBK-INST WRS)
STEP ELEVEN:
Place Slide in its Correct and Final Position
Using 2 people, gently move the fully assembled slide to its correct and final position on the
deck.
STEP TWELVE:
On Deck Installation
Once the slide is in its final position then using a bubble level ensure the 4 legs are straight
(plumb), next fully tighten the leg to flume bolts then using the deck anchor flange and the
step “L” brackets as a template mark the locations for the anchor bolts. Gently move the
slide to one side. Then using a 3/8” masonry drill bit and a hammer drill, drill a hole 1-3/4”
- 2” deep, make sure you drill to the correct depth and make sure not to drill all the way
through the deck. Gently hammer the bolt into the hole in the deck with 3/4” - 1” of the bolt
above the deck. Gently lift and reposition the slide deck anchors and the “L” brackets over
the bolts. Put anti-seize on the bolts, then flat washer and nut, secure the nuts on the bolts
but do not over tighten. (See Fig. 14)
STEP THIRTEEN:
In Deck Installation
Attach slide legs to the higher of the 2 bolt holes on the deck anchor “hole B”, make a mark
with a marking pen or duct tape 4-1/4” from the bottom of the deck anchor, shim the legs
so the mark you made on the deck anchor is flush with the finished deck, using a bubble level
ensure the legs are plumb. Pour concrete to secure legs, ensure the proper footing depth
is maintained under the deck anchor. (See Fig. 15)
NOTE: If you are
installing slide
onto a deck using
pavers, refer to
optional Wild Ride
Paver Kit info on
page 13.
Fig. 14
9-3/16”
Deck Anchor
Hole A
Deck Line
Fig. 15
9-3/16”
Deck Line
Deck Anchor
Concrete
Deck
4-1/4”
3”
3/4”