Intel® Server Chassis SR1475 / Intel® Server System SR1475NH1-E
Revision 1.0
- 73 -
7.6.2 Serviceability
No troubleshooting by maintenance personnel is to be performed. Only unit replacement will be
done in the field.
7.7 Power Supply Returned for Repair
Power supplies returned to the vendor for repair, are returned for full credit.
Power supplies returned from vendor repair will be accepted by Intel only after the vendor has
performed an additional burn-in of 4 hours min. at 45°C ± 5°C at maximum load and has re-
tested the power supply following the burn-in.
The vendor shall supply failure analysis, and final test results on all repaired units reshipped to
Intel.
7.8 Modifications / Change Control
Following the qualification of the power supply, any changes in parts, materials, or processes
used in power supply manufacturer which affect form, fit, function, safety, reliability (type one
changes), or documentation of the power supplies delivered to Intel (type two changes) must be
approved by Intel prior to the incorporation of the changes.
Significant changes as determined by Intel will require re-qualification of the power supply as
per Qualification Inspection/Test Procedure.
Intel reserves the right to negate type one (form, fit, safety, function, or reliability) changes within
30 days. All type one changes must be submitted to Intel for review and must be approved in
writing.
Modification to certification records shall be provided to Intel upon completion.
7.9 Power Supply Compliance Overview
The power supply must comply with all regulatory requirements for its’ intended geographical
market. Depending on the chosen market, regulatory requirements may vary. Although a power
supply can be designed for worldwide compliance, there may be cost factors that drive different
versions of supplies for different geographically targeted markets.
Summary of Contents for SR1475
Page 87: ......