Thank you for buying an Intel® Server System.  The following information will help you 
assemble your Intel® Server System and install components.

If you are not familiar with ESD [Electrostatic Discharge] procedures used during 
system integration, see the complete ESD procedures described in your Service Guide.

This guide and other supporting documents are located on the web at: 

http://www.intel.com/support.

 

Intel® Server System P4000CP Family
Quick Installation User's Guide

G43150-001

Summary of Contents for P4208CP4MHGC

Page 1: ...ts If you are not familiar with ESD Electrostatic Discharge procedures used during system integration see the complete ESD procedures described in your Service Guide This guide and other supporting do...

Page 2: ...This page is intentionally left blank...

Page 3: ...all PCI Card Assembly 7 Install Expander Card optional 8 Install Alternate Serial Port optional 8 Install Intel Remote Management Module 4 NIC optional 8 Install Intel RAID Smart Battery optional 9 In...

Page 4: ...ct Configuration Configuration Feature 8 x 3 5 Hot Swap 8 x 2 5 Hot Swap Hard Drive System Fan One Fixed 550W Two Hot Swap 750W RKSATA8 RKSATA8 RKSAS8 Power Supply P4308CP4MHEN P4308CP4MHGC P4208CP4MH...

Page 5: ...8 x 3 5 Hot swap HDD Cage Front Control Panel 5 25 Peripheral Bays Server Board P PCI retainer NOTE Airduct is not shown Intel Server System P4308CP4MHEN A E F G H B C D I P J K L N M O System Feature...

Page 6: ...Q System Features and Components 750 W Hot Swap Power Supply Two I O Ports A Kensington Cable Lock Mounting Hole PCI Add in Board Slot Covers AC Input Power Connector Two Alternate Serial Port Knockou...

Page 7: ...s A and B by giving each screw two rotations each time until all screws are loosened Using a 2 Phillips screwdriver start with screw 1 and loosen it by giving it two rotations and stop IMPORTANT Do no...

Page 8: ...ate Push down on the locking lever on the CLOSE 1st side F Latch the Locking Lever A B Slide the tip of the lever under the notch in the load plate Make sure the load plate tab engages under the socke...

Page 9: ...s Open both DIMM socket levers C A D E Note location of alignment notch B CAUTION Avoid touching contacts when handling or installing DIMMs A C D B E IMPORTANT Visually check that each latch is fully...

Page 10: ...t the hard disk drive assembly into the cage opening and push until the locking lever engaged Push in the lever to lock it into place then close the door G H 9 E F B A Install Hard Drive Continued 3 5...

Page 11: ...ard is secured into the slot under the PCI e Card Retainer 10 Install PCI e Card Assembly A Remove the PCI e slot shield by pushing the shield out from inside the chassis B Rotate the PCI e retainer a...

Page 12: ...ment Module 4 NIC optional Top View A A Attach the metal fastening bracket to Intel Dedicated Server Management NIC module and secure the bracket with two screws B Remove the alternate RMM4 knock out...

Page 13: ...latch in the direction shown and pull out of the system by the handle Note Applies only to the chassis with hot swap power supply configuration 16 Rack Mount Con guration optional If you intend to con...

Page 14: ...A Con rm BIOS Version Look on the Server System Management screen in the BIOS Setup Utility to determine the installed BIOS version Compare this to the versions at http www intel com support If new ve...

Page 15: ...nect two power cables C Connect the I2 C cable to I2 C_IN connector on bottom 8x2 5 backplane A Connect Mini SAS data cables B Connect power cables 1 x 4 to 2 x 2 Power adapter cable is needed C Conne...

Page 16: ...G Fixed HDD Data Cable H System FAN 1 I System FAN 2 Description A CPU1 CPU2 Power Cable B Server Board Main Power Cable C Backplane Power Cable D ODD Power Cable E Front Panel Cable USB Cable F ODD...

Page 17: ...G43150 001...