65
Right the frame from a prone position
Product Support:
Figure 19. Underside of frame showing location of frame feet
It may be necessary to lift the frame a short distance to gain access to install the
frame feet. Lift the frame the minimum distance required to achieve this.
Warning
Crush hazard - Ensure that all persons in the immediate area are standing away from
the frame during lifting.
Do not lift the frame more than 8 cm (3 in) off the floor.
7. Slowly lift the frame until it is in an upright position and is lifted off the floor.
8. Slowly move the load frame away from the shipping skid and remaining packaging
materials.
9. When the frame is clear of the packaging material, slowly lower the load frame to the
floor so that it is standing on its base in an upright position.
10. Remove the slings from the crosshead.
11. Remove the slings and M16 hoist bolts from the frame base.
The frame can now be positioned into its operating location and then installed by an
Instron service representative.
X
X
X
X
Summary of Contents for 34FM-100
Page 1: ...Model 34FM 100 Dual Column Floor Model Preinstallation Manual M10 17541 EN Revision A...
Page 8: ...Preliminary Pages 8 M10 17541 EN...
Page 12: ...Preliminary Pages 12 M10 17541 EN...
Page 50: ...Chapter Specifications 50 M10 17541 EN...
Page 58: ...Chapter Risk reduction and safe use 58 M10 17541 EN...
Page 72: ...Chapter Lifting and handling 72 M10 17541 EN...
Page 74: ...74 M10 17541 EN...
Page 75: ......
Page 76: ...www instron com...