10
ASSEMBLY
STEP 1: Set meter tube on the base frame
a)
Make the communication line through the right meter tube.
b)
Set meter tube on the base frame. Use 2 pcs of Screw M8*15 with 2 pcs of washer and 4pcs of Screw
M8*50 with 4 pcs of washer, 4 pcs of nut to solid the meter tube. (Don’t fasten screw at first)
STEP 2: Put meter on the meter tube
a)
Make sure that communication lines are connected correctly, in case they are connected in reverse.
b)
Put meter on the meter tube. Use 6 pcs of Screw M8*15 with 6 pcs of washer to solid the meter. (Don’t
fasten screw at first)
c)
After the machine is power on, push “Start”, if everything goes well, then fasten screws mentioned in
front steps.