page 14
Digital Projection INSIGHT 4K Dual LED & Quad Series
Installation and Quick-Start Guide
POSITIONING THE SCREEN AND PROJECTOR
Rev B June 2016
Positioning The Screen And Projector
Installation should be carried out by authorised personnel only.
1. Install the screen, ensuring that it is in the best position for viewing by your audience.
2.
Mount the projector, ensuring that it is at a suitable distance from the screen for the image to fill the screen.
If table mounting, set the adjustable feet so that the projector is level, and perpendicular to the screen.
If ceiling mounting, refer to the rigging frame documentation for further instructions.
Fixing holes for ceiling mounting
The drawing below shows the positions of the feet for table
mounting, as well as the fixing holes needed for ceiling
mounting.
1
Four adjustable feet
2
M6 holes for ceiling mounting
Ten out of twelve M6 holes found on the bottom of
the projector are used for ceiling mounting - the pair
closest to the front of the projector are not used.
The screws should not penetrate more than 15 mm
into the body of the projector.
Notes
Always allow the projector
to cool for 5 minutes before
disconnecting the power or
moving the projector.
Ensure that there is at least 30
cm (12 in) of space between the
ventilation outlets and any wall,
and 10 cm (4 in) on all other
sides.
Projectors are not designed to
be stacked on top of each other
unless a rigging frame is used.
1
1
2
2
2
2
1
1
2
2
2
2
2
2