Copyright Innovative Technology Ltd 2008 GA820-1
5 REPROGRAMMING THE BV50
n
quirements.
e Configuration Card Programming Function of the BV50 is enabled by pressing the
of the BV50 (see Chapter 4.2.1 - Ports and
nfiguration button once (<1second) while the bill acceptor is powered up.
ntered.
ile the interface is being changed. If the LEDs flash a number
ng the
SOFTWARE
required Communication Interface (SSP, ccTalk, Parallel etc).
Program the bill acceptor by downloading pre-prepared download files via the DA1 or DA2
Check the firmware version and currency set already loaded on a BV50 unit.
r the USB port using a
s powered up.
D’s will flash
e and select ‘set validator
download the new settings to
5.1 BV50 CONFIGURATION CARDS
The Configuration Cards offer the following functions:
• Select required Communication Interface (SSP, Pulse, Parallel etc).
Adjust the channel and pulse configuration on a pre-programmed BV50 to your ow
•
re
Th
‘Configuration Button’ on the right hand side
Buttons for the button location).
For details on how to complete the configuration cards please see Appendix D – Configuration
Cards
. Press the Co
1
2. The bezel LED’s will now flash with a steady heartbeat until a Configuration Card is e
3. Once the Configuration Card has been entered the bill acceptor reads the card and
immediately returns it.
. The LEDs then flash rapidly wh
4
of times slowly, it is an indication of an error (For details of the Error Flash codes please see
Appendix D – Configuration Cards
5. When the changes are complete the bill acceptor resets.
tton
If a configuration card is not entered, this function can be cancelled by pressing the bu
again once. It is now possible to check the programmed settings of the BV50 by pressi
Configuration button twice quickly (double click). For details see Appendix D – Configuration
Cards
.
5.2 BANK NOTE VALIDATOR CURRENCY MANAGER
The ITL BNV Currency Manager software offers the following functions:
• Adjust the channel and pulse configuration on a pre-programmed BV50 to your own
requirements.
• Select
•
kit.
•
• Download an updated version of firmware onto the BV50.
• Use diagnostic functions to check bill acceptors operation
The BV50 is connected to either the serial port of a PC using a DA1 kit, o
DA2 kit and set to programming mode using the configuration.
1. Press and hold the Configuration button (>2 seconds) while the bill acceptor i
utton. The Bezel LE
2. The bezel LED’s will illuminate. Release the configuration b
rapidly as the SSP interface is being programmed
. Use the ITL Bank Note Validator Currency Manager Softwar
3
options’ from the ‘tools’ menu
4. The interface and other configurations can be altered to the desired settings
. Click the apply changes button on the ‘update changes’ tab to
5
the acceptor
BV50 Operations Manual 16