TM
Metering System Quickstart Guide
Electro
Industries/GaugeTech
™
Powered by Innovation™
Service: Single Phase, 3-Wire Service with Direct Voltage and 1 CT Connection for Metering
24 Single Phase Loads - MP200-S
IMPORTANT! All CTs must have one side grounded to reduce shock hazard.
EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed
from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com.
I1-LO
LOADS
VL1
LINE
N
L(+) N(-)
I1-HI
VL1
I3-HI
I2-HI
I2-LO
VL2
I3-LO
CONNECTION TYPE: Direct Voltage, CTs
To monitor 24 individual loads.
See accuracy table for limiting factors.
Power Supply
Only one circuit is shown.
Duplicate for additional circuits.
Short Voltage inputs
together
Earth Ground
CT Shorting Block
EI# SB-6CT
Earth Ground
FUSE 3A
VL2
VL1
VL2
2
1
N
FUSES
2 x 0.1A
Run lines VL1 and VL2 through
the CT in opposite directions
Set PT ratio to half
in the meter.
SERVICE: SINGLE PHASE, 3-WIRE
Connection