Electrical Installation:
Service: Three Phase, 4-Wire WYE Service Direct Voltage and 3 CT Connection for Metering
8 Three Phase Loads: MP200-Y
IMPORTANT! All CTs must have one side grounded to reduce shock hazard.
EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed
from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com.
WARNINGS! For Electrical Installation:
All Primary and Secondary circuits can, at times, produce lethal voltages and currents.
Avoid contact with any current-carrying surfaces.
The current inputs are only to be connected to external current transfomers
(CTs).
I1-LO
LOAD
V2
V1
LINE
N
I1-HI
V1
I3-HI
V3
V3
I2-HI
I2-LO
V2
N
I3-LO
SERVICES: WYE, 4 WIRE.
Power Supply
Connection
CT Shorting Block
EI# SB-6CT
Only one 3 phase circuit is shown.
Duplicate for additional circuits.
Earth Ground
Earth Ground
FUSES
3 x 0.1A
FUSE 3A
CONNECTION TYPE: Direct Voltage, CTs
3
2
1
N
L(+) N(-)
Summary of Contents for Electro Industries/GaugeTech Shark MP200-S