
INNOVATECH PRODUCTS AND EQUIPMENT CO., INC.
20
START OF DAY OR SHIFT
Use the following procedures to start the day or shift or to set up for a new job.
You are ready to test the Terminator® before starting a job or moving it to a job site.
1.) Make sure Batteries are fully charged.
2.) Check all the fuses located under the console panel.
3.) Check for Hydraulic oil leaks.
4.) Check the blade and replace or adjust it as needed for the job.
5.) Check the tires.
6.) Inspect the machine as a whole; to be sure it is ready to run.
7.) Mount machine. Pull keyed knob up for power.
8.) When dismounting machine, push red knob off to kill power.
CLOSE OF DAY OR SHIFT
1.) Hook up battery charger to the loose battery connector, make sure it is charging and lock
console.
2.) Inspect the machine overall to make sure it is okay to run the next day or shift.
3.) For safety, remove key.
Summary of Contents for TERMINATOR-2000e
Page 31: ...INNOVATECH PRODUCTS AND EQUIPMENT CO INC 31 BASIC RULES FOR BATTERY CARE AND MAINTENANCE ...
Page 45: ...INNOVATECH PRODUCTS AND EQUIPMENT CO INC 45 TERMINATOR 2000 e PARTS CATALOG ...
Page 47: ......
Page 49: ......
Page 51: ......
Page 53: ......
Page 55: ......
Page 57: ......