background image

The second m8 bolt is also loosened from the upper fender well.

The air box and bracket is now lowered into the engine compartment.  Align the
bracket holes with the tapped holes on the fender well.

The original m8 bolt is used to secure the bracket to the fender well.

The air box is carefully lowered into the engine compartment with the bracket is
placed over the fender well as shown above.

The second m8 bolt is used to fasten the other end of the bracket as shown
above.  

The air box should be firmly secured to the fender well once the m8 bolts have
been properly fastened.

With clamps provided, install the short side of  the 4” elbow to the turbo. 

Attach the step hose to the power box with clamps provided, and tighten on the
box only.

Page 4 of part# PF8075

Figure  23

Figure  22

Figure  21

Figure  20

Figure  19

Figure  24

Figure  26

Figure  25

Reviews: