
INHECO
07
Doc ID: 900372-002
October 2018
2.2.
scope of delivery
Before initial operation, make sure that the shipment of your unit and its scope of supply
is complete and no parts are damaged.
In case of parcel or product damages, make photos of the damaged boxes and products
and email them to
immediately. Transportation damages
must be reported to INHECO within 7 days of delivery. The following components should
be included in each shipment:
Fig.1: Components
( 1 ) HeatPAC incl. Sub-D-Connector Cable and frame for PCR Adapter
2.3.
functional Elements
The functional element of the HeatPAC is the temperature controlled contact surface.
The device has to be controlled via a TEC Control Unit ( MTC or a STC).
1