
INHECO
16
Doc ID: 900434-001
March 2018
4
HarDWare InstaLLatIon
4.1.
Scope of Supply
Before initial operation, make sure that the shipment of your unit is complete and neither
packaging nor parts are damaged → Components, chapter 2.2, page 7. Keep original
packaging for future shipments.
The Power Supply and Power Cable are not part of the scope of supply, as for stacked
devices only the master device needs a Power Supply and Cable . They have to be
ordered separately → Chapter 9.
4.2.
Initial Operation
A technical skilled integrator has to install and integrate the Incubator.
4.2.1.
Disassembling the transportation screws
(only for Shaker devices)
After unpacking the Incubator Shaker device, the two red screws (transportation lock) at
the bottom side have to be unscrewed without tilting or turning the device upside down.
Keep the screws and plate for later transportation purposes. Do not dispose the original
package, as it might be needed for further transportation.
NOTE
Turning the unit upside down might require a renewal of the shaker drive calibration.
Keep the screws for later transportation purposes.
A transportation label on the top of the Shaker device is indicating where the
transportation lock is applied and also that you should not turn the device upside down.
Fig.7:
Transportation label at the upper side