![Ingersoll-Rand TRANE AFDJ Installation, Operation And Maintenance Manual Download Page 63](http://html1.mh-extra.com/html/ingersoll-rand/trane-afdj/trane-afdj_installation-operation-and-maintenance-manual_2059412063.webp)
AFDJ-ADF001A-EN (10 Oct 2014)
5
6. Drive line-up Status
Initials
Date
The medium voltage and low voltage power is available for start-up activities.
Strongly recommended that full load is available for full-load testing at start-up. Drive
Commissioning final setup requires full load.
Notes or Comments:
PowerFlex 7000 “A” or “B” Frame Pre-Commissioning Check List