![Ingersoll-Rand TRANE AFDJ Installation, Operation And Maintenance Manual Download Page 36](http://html1.mh-extra.com/html/ingersoll-rand/trane-afdj/trane-afdj_installation-operation-and-maintenance-manual_2059412036.webp)
Pre-Installation
36
AFDJ-SVU01D-EN
Connect the thermistor cable to the connection terminal
assembly (see
Two clear plastic air baffles (to optimize airflow through
the CMC) will be supplied. These mount horizontally and
are placed on top of four white metal baffle supports that
attach around the perimeter of the CMC cabinet (see
). They are secured when the retaining brackets
are placed on top of the baffles and affixed with taptite
screws.
Note:
The rear baffle support must be removed before
installing the CMC.
Figure 35.
Ground cable termination
Figure 36.
Thermistor terminal blocks and connection
cable
1.
Thermistor cable connection
2.
Thermistor terminal assembly
1
2
Figure 37.
Air baffles and mounting assembly (rear
view)
1.
Air baffles
2.
Rear baffle support
3.
Baffle retaining brackets
Figure 38.
Front view of CMC cabinet as shipped (front
barrier plate removed for photograph)
1.
Four CMC power cables
2.
Air baffle retaining brackets (3 of 4 shown)
3.
Two air baffles
1
2
3
1
2
3