Precedent Units Step 5 - Fuel Level (Option)
IMPORTANT: All electrical splice connections of the UFLS harness must be made with crimp and solder style connectors with separate heat shrink
tubing. DO NOT burn the heat shrink. If the heat shrink is burnt, charred, or has bubbles from overheating, the wire connections mus be removed and
redone correctly.
Fuel Level Harness Installation
1. Inside the control box locate the existing 3 fuel sensor wires (BLACK,
WHITE, GREEN) coming into the control box and spliced into the
fuel harness (FUELN-02, FUEL-02, 8F-02).
2. Cut these 3 wires.
3. Strip the wire ends and slide supplied heat shrink tubing onto each wire
and position them away from the joint.
4. Connect each wire from the REB harness to the existing fuel sensor
wires with a wire connector and crimp securely.
5. Solder wires to wire connectors with a soldering gun.
6. Slide shrink tubing over connections and apply heat with a heat gun.
7. Secure harness inside control box with bandwraps.
Continue to “Configuring Fuel Tank” on page 18 to complete the
installation.
Wire Connections
Inside Control Box
BLACK to FUELN-02
WHITE to FUEL-02
GREEN to 8F
Summary of Contents for Thermo King TracKing
Page 2: ......
Page 4: ...2 TracKing Cellular Release History Released 07 15...
Page 13: ...11 Precedent Units Step 2 Antenna and Battery Installation...
Page 15: ...13 Precedent Units Step 3 REB Installation...
Page 17: ...15 Precedent Units Step 4 Door Switch Option...
Page 19: ...17 Precedent Units Step 5 Fuel Level Option...
Page 23: ...21 SB Units Step 1 Datalogger Configuration Procedures Text Header...
Page 27: ...25 SB Units Step 3 REB and Battery Installation...
Page 29: ...27 SB Units Step 3a REB and Battery Installation SR2 to SR3...
Page 31: ...29 SB Units Step 3b Units with SR2 or SR3 w Razor...
Page 33: ...31 SB Units Step 3c For Units with ThermoGuard non SR2...
Page 35: ...33 Super II Units Step 1 Datalogger Configuration Procedures Text Header...
Page 37: ...35 Super II Units Step 2 Antenna Installation...
Page 39: ...37 Super II Units Step 3 TracKing Installation...
Page 44: ...42 BLANK PAGE...
Page 46: ......