Precedent Units Step 6 - Configuration Procedures
NOTE: An additional harness (41-9171 sold separately) is required to
connect the REB and use TDAC.
Configuring Door Switch
1. Reinstall the unit’s negative battery cable.
2. At the unit, go to Guarded Access Menu.
NOTE: The Guarded Access Menu is not available if the engine is
running.
3. Turn off the engine.
4. Scroll down and select Unit Configuration.
a. REB Door Switch enable (set to Enabled).
5. Using TDAC, connect to REB enable the following under Device
Setting:
a. Read Door in Countdown (set to Enabled).
6. The unit is now programed for door switches, press the exit key.
7. In the TracKing website under Administration/Vehicle Maintenance,
enable the following:
b. Door Switch (select check mark in box).
Configuring Fuel Tank
1. Reinstall the unit’s negative battery cable.
2. At the unit, go to Guarded Access Menu.
NOTE: The Guarded Access Menu is not available if the engine is
running.
3. Turn off the engine.
4. Scroll down and select Unit Configuration.
a. REB Fuel Level Sensor Types (set to Solid State or Float to match
type used).
5. Using TDAC, connect to REB enable the following under Device
Setting:
b. REB Fuel Sensor in Countdown (set to Enabled).
6. The unit is now programed for fuel, press the exit key.
7. In the TracKing website under Administration/Vehicle Maintenance,
enable the following:
c. Fuel Tank size value.
Summary of Contents for Thermo King TracKing
Page 2: ......
Page 4: ...2 TracKing Cellular Release History Released 07 15...
Page 13: ...11 Precedent Units Step 2 Antenna and Battery Installation...
Page 15: ...13 Precedent Units Step 3 REB Installation...
Page 17: ...15 Precedent Units Step 4 Door Switch Option...
Page 19: ...17 Precedent Units Step 5 Fuel Level Option...
Page 23: ...21 SB Units Step 1 Datalogger Configuration Procedures Text Header...
Page 27: ...25 SB Units Step 3 REB and Battery Installation...
Page 29: ...27 SB Units Step 3a REB and Battery Installation SR2 to SR3...
Page 31: ...29 SB Units Step 3b Units with SR2 or SR3 w Razor...
Page 33: ...31 SB Units Step 3c For Units with ThermoGuard non SR2...
Page 35: ...33 Super II Units Step 1 Datalogger Configuration Procedures Text Header...
Page 37: ...35 Super II Units Step 2 Antenna Installation...
Page 39: ...37 Super II Units Step 3 TracKing Installation...
Page 44: ...42 BLANK PAGE...
Page 46: ......