![Ingersoll-Rand Thermo King TracKing Installation Manual Download Page 24](http://html1.mh-extra.com/html/ingersoll-rand/thermo-king-tracking/thermo-king-tracking_installation-manual_2059658024.webp)
22
SB Units Step 2 - Antenna Installation
NOTE: These antenna instructions are for
SB-30 Series Units using the REB and RAZOR
modules.
Antenna Installation and Cable Routing
Open all unit doors and access panels.
1. Mount antenna to antenna bracket with provided washer and nut and
tighten securely. The antenna is non-directional and can be mounted in
any direction, but it must have an unobstructed view of the sky.
NOTE: Two styles of antennas and brackets are used. Install the
antenna and bracket in your kit as shown in the illustration.
2. Loosely attach antenna and bracket to center of frame with supplied
1/4-20 screws, lock washers and flat washers.
NOTE: Look for existing holes in center of frame. If they are not
there, use the bracket as a template to mark and drill two 1/4 inch
holes and install 1/4-20 threaded inserts (installer supplied).
3. Clean plastic bulkhead with isopropyl alcohol wet wipes (203-498) and
wipe dry.
IMPORTANT: For maximum bond strength the ideal tape application is
accomplished when temperature is between 2.07 to 2.95 C (70 to 100 F)
and the bond is allowed to cure for 72 hours. The bond strength is
dependent upon the amount of adhesive-to-surface contact developed.
Firm application pressure develops better adhesive contact and thus
improves bond strength.
4. Peal off protective double sided tape on antenna bracket and firmly
press bracket to plastic bulkhead. Tighten antenna bracket hardware
securely.
5. Route antenna cable down to control box as shown. Secure cable to
lifting eye with bandwraps and to bulkhead with caulk.
•
Maintain 76.2 mm (3.00 in.) of clearance from muffler, belts and
pulleys.
•
Secure cable to main harness with bandwraps and insert cable into
control box through harness grommet.
•
Antenna cables will be connected in a later step.
Summary of Contents for Thermo King TracKing
Page 2: ......
Page 4: ...2 TracKing Cellular Release History Released 07 15...
Page 13: ...11 Precedent Units Step 2 Antenna and Battery Installation...
Page 15: ...13 Precedent Units Step 3 REB Installation...
Page 17: ...15 Precedent Units Step 4 Door Switch Option...
Page 19: ...17 Precedent Units Step 5 Fuel Level Option...
Page 23: ...21 SB Units Step 1 Datalogger Configuration Procedures Text Header...
Page 27: ...25 SB Units Step 3 REB and Battery Installation...
Page 29: ...27 SB Units Step 3a REB and Battery Installation SR2 to SR3...
Page 31: ...29 SB Units Step 3b Units with SR2 or SR3 w Razor...
Page 33: ...31 SB Units Step 3c For Units with ThermoGuard non SR2...
Page 35: ...33 Super II Units Step 1 Datalogger Configuration Procedures Text Header...
Page 37: ...35 Super II Units Step 2 Antenna Installation...
Page 39: ...37 Super II Units Step 3 TracKing Installation...
Page 44: ...42 BLANK PAGE...
Page 46: ......