Suction Pressure Regulator (SPR) Adjustment
Procedures - MAX
IIm
mp
po
orrtta
an
ntt:: Using the absence of bubbles in the sight glass as an indicator of correct refrigerant charge can be
misleading, Y
YO
OU
U M
MU
US
ST
T refrigerate the box to 0-5ºC to get a more precise indication from the sight glass.
W
WA
AR
RN
NIIN
NG
G
E
Eq
qu
uiip
pm
me
en
ntt D
Da
am
ma
ag
ge
e!!
L
Lo
ow
we
err sse
ettttiin
ng
gss cca
an
n b
be
e sse
elle
ecctte
ed
d b
ba
asse
ed
d o
on
n llo
occa
all p
prre
effe
erre
en
ncce
ess tto
o o
op
pttiim
miizze
e h
he
ea
attiin
ng
g o
op
pe
erra
attiio
on
n.. H
HIIG
GH
HE
ER
R v
va
allv
ve
e
sse
ettttiin
ng
gss tth
ha
an
n ssp
pe
ecciiffiie
ed
d w
wiillll lle
ea
ad
d tto
o ssy
ysstte
em
m m
ma
allffu
un
nccttiio
on
n iin
nccllu
ud
diin
ng
g o
op
pe
erra
attiio
on
n iin
ntte
errrru
up
pttiio
on
n w
wh
he
en
n b
bo
ox
x iiss w
wa
arrm
m
((m
mo
otto
orr o
ov
ve
errccu
urrrre
en
ntt cco
on
nfflliicctt w
wiitth
h iin
nv
ve
errtte
err lliim
miittss))..
IIm
mp
po
orrtta
an
ntt:: All new unit installations require these adjustment procedures. Failure to do so may not allow the unit to
operate at its maximum capacity.
N
No
otte
e:: The following procedures are for initial settings. Sometimes conditions such as high or low ambient
temperatures may require that the settings be fine-tuned for optimum performance.
M
MA
AX
X units are equipped with a SPR valve located in the evaporator (See illustration below). The valve is used to limit
the load on the compressor. This also affects the current draw of the electric motor.
1. Install gauge manifold set onto the suction service port at the compressor (See illustration below).
2. Attach an additional compound gauge on suction service port located on copper suction tube in evaporator to
monitor suction pressure going to the SPR valve (See illustration below).
3. Connect standby power receptacle to an appropriate electric power source.
4. Place jumper wire between the 12 and CHB wires at the defrost termination switch to verify the unit will run in
defrost.
5. Start unit and run in defrost on the electric compressor until the pressure on the additional compound gauge
attached to the suction service port stabilizes at a pressure above 45 psig (310 kPa).
6. Check the suction pressure on the gauge attached to the service port at the electric compressor. It should be not
higher than 40 +-2psig ( -14kPa).
N
No
otte
e:: If the customer is expecting to use the heating function of the unit, the optimal setting would be 26+-2psig
(-14kPa).
7. If the pressure is not within range, remove the protective cap and adjust the SPR valve to the correct setting.
8. Remove gauge manifold set, the additional compound gauge, and the jumper wire when finished with the
procedure.
1.
SPR Valve
2.
Service Port E-200
3.
Service Port Evaporator
Summary of Contents for THERMO KING E-200 Series
Page 29: ...TK 61694 18 IM EN 29 H Ho ol ld do ov ve er r B Ba at tt te er ry y O Op pt ti io on n ...
Page 33: ...TK 61694 18 IM EN 33 S St ta ar rt t S St to op p F Fu un nc ct ti io on na al li it ty y ...
Page 37: ...TK 61694 18 IM EN 37 I In nc cr re ea as se ed d I Id dl le e S Sp pe ee ed d S Se et tu up p ...
Page 49: ...TK 61694 18 IM EN 49 N No ot te es s ...
Page 50: ...50 TK 61694 18 IM EN N No ot te es s ...