![Ingenico iWL252 Operating Manual Download Page 107](http://html.mh-extra.com/html/ingenico/iwl252/iwl252_operating-manual_2058835107.webp)
SKYZER TECHNOLOGIES
PAGE 107 OF 116
NITRO INGENICO ICT250 AND IWL252 2015 PAYMARK SOFTWARE OPERATING GUIDE
Version 1.0
If there is no pending transaction stored on the terminal, the following prompt
will be displayed.
Press OK to go to the next diagnostic function.
13.2.4
Comms Test Transaction
To perform the comms test on the terminal, select YES or NO to return to the
diagnostic function same as the selecting CANCEL.
This function is performed to diagnose if the PC has connectivity with the
Paymark network. If the response is returned as ACCEPTED then the PC was
able to establish connectivity with the Paymark network successfully.
Select OK to return to the diagnostic function.