background image

9

Release  07/22

Roadside Safety Barrier

Figure 7: Clear Zone Requirement for the use of Departure Terminals

Figure 8: ET-SS End Terminal

7.0  Installation

7.1  Terminals

Guardrail end terminals are designed to provide a soft 
gating impact preventing the end rail from spearing 
an impacting vehicle. Terminals also introduce tensile 
and flexural strength necessary to ensure redirection 
performance of the length-of-need section.
Ezy-Guard Smart is installed at a system height of 
730mm,  measured to the top of the rail. This height is 
compatible with the ET2000 Plus and public domain 
terminals such as the MELT (NSW, Qld, SA).
Departure terminals should only be installed if they are 
located outside the clear zone of approaching traffic. See 
Figure 7. The clear zone is the horizontal width of space 
available for the safe use of an errant vehicle.

The clear zone is dependant upon the speed of the vehicle. 
Guidelines are contained with regulatory publications.
Terminals should be installed in accordance with the 
proprietor’s drawings and specifications. Z-posts are 
not to be used in the terminals unless approved by the 
proprietor.
The installation of terminals will typically incorporate the 
use of blocking pieces positioned between the posts 
and rail. This will require the supporting posts to be 
offset from the set-out line used for the installation of the 
Z-posts which do not require blocking pieces.
In addition, the post spacing used in the terminals 
and transitions may vary from the 2m spacing used 
for installation of Ezy-Guard Smart. The required post 
spacing for terminals and transitions will be contained in 
the proprietor’s drawings.

approach terminal

barrier

departure terminal

A departure terminal can 

only be used if located 

outside the clear zone of 

approach terminal

barrier

departure terminal

A departure terminal can 

only be used if located

outside the clear zone of 

Summary of Contents for Ezy-Guard Smart

Page 1: ...www ezyguard com Release 07 22 ProductManual ...

Page 2: ...and rail stiffening plates This unique connection provides a soft ride down for the occupants and smooth vehicle containment and redirection 2 0 Specifications Ezy Guard Smart Z Post Length 1 600mm Ezy Guard Smart Z Post Mass 12 3kg Ezy Guard Smart System Mass 18 6kg per metre Rail Height Above Ground 730mm Z Post Height Above Ground 720mm Post Spacing 2 000mm Ezy Guard Smart SystemWidth 200mm MAS...

Page 3: ...est matrix requires the following impacts 1100kg car travelling at 100km h and 25 degrees 2270kg pick up travelling at 100km h and 25 degrees Crash test impact conditions are defined by the mass speed and angle of the impacting vehicle Crash test standards and performance levels can be compared by calculating the impact severity IS IS M V sin θ 2 Where IS is the impact severity in joules J M is th...

Page 4: ...ts theZ postsaredesigned to yield by bending near ground level This bending action absorbs impact energy reducing the potential for postfracturing Afracturedorsplitguardrailpostpresents a significant laceration hazard to vulnerable road users TheEzy GuardSmartdesigndoesnotcontainanyelements that become projectiles and there are no aggressive edges Shielded Posts The revolutionary design of Ezy Gua...

Page 5: ...ded NCHRP 350 Test Level 3 or Test Level 4 impacts 5 2 Rapid Installation Repair Ezy Guard Smart installation can be up to twice as fast to install than conventional guardrail barriers and unlike cable barrier systems no concrete is required The Ezy Guard Smart design uses fewer components and features 1 600mm Z posts that are rapidly driven into the ground The Z post embedment depth is just 880mm...

Page 6: ...rcomponentsthanthepublic domain guardrail systems Z posts weighing just 12 3kg are 50 lighter than traditional C posts The lightweight Z post reduces manual lifting by installation crews The rounded edges of the Z post provides a handlelike grip when lifting reducing the possibility of hand lacerations The Z profile allows the installer to maintain a firm grip and facilitates correct lifting techn...

Page 7: ...ffsets is shown in Figure 6 and is derived using a point mass model and assumes maximum steering and a coefficient of friction of 0 7 dry pavement If the deflection needs to be reduced due to the proximity of a road side hazard this can be achieved by reducing the post spacing Refer Table 2 for deflections with post spacing reduced to 1m The reduced post spacing should be initiated 10m upstream an...

Page 8: ...arrier 8mvehicleoffsettobarrier Impact Angle degrees Table 1 Ezy Guard Smart Deflections Speed km h Dynamic Deflection m Post Spacing Test Standard Dynamic Deflection 70 2m MASH TL2 0 90 100 1m MASH TL3 1 05 100 2m MASHTL3 1 65 70 50 60 80 90 100 110 120 130 0 0 5 0 10 0 15 0 20 0 25 0 30 0 35 0 40 0 70 50 60 80 90 100 110 120 130 0 0 5 0 10 0 15 0 20 0 25 0 30 0 35 0 40 0 m Example Example Speed ...

Page 9: ...cle Theclearzoneisdependantuponthespeedofthevehicle Guidelines are contained with regulatory publications Terminals should be installed in accordance with the proprietor s drawings and specifications Z posts are not to be used in the terminals unless approved by the proprietor The installation of terminals will typically incorporate the use of blocking pieces positioned between the posts and rail ...

Page 10: ...bedment depth has been modified in accordance with Table 4 Anymodificationcarriedoutafterfabricationwillrequire repair to the galvanized coating A corrosion resistant treatment shall be applied to the freshly cut surface ICP recommend a Zinc metal spray in accordance with ISO 2063 or AS NZS 2312 7 5 Soil Requirements Embedment Depth The Z post is designed to yield by bending near ground level duri...

Page 11: ...direct the errant vehicle The specially engineered Z post dissipates energy by yielding through bending near ground level This means that typical recommendations for the installation of a traditional guardrail post in rock are not applicable to the Z post When rock is encountered the installation guidelines as detailed in Table 4 are applied If required the bottom of the post may be cut onsite by ...

Page 12: ...ered at the surface Drill a 110 300mm diameter hole to a depth of 450mm install the post in the hole and backfill Rock is encountered within 450mm of the surface Drill a 110 300mm diameter hole 450mm into the rock or to a minimum total post embedment depth of 650mm whichever comes first install the post and backfill 450 650 min 0 450 rock soil 450 rock ...

Page 13: ...e rock or to a minimum total post embedment depth of 650mm whichever comes first install the post and backfill Rock is encountered 600mm to 800mm below ground Drill a 110 300mm diameter hole 50mm into the rock or to a minimum total post embedment depth of 800mm whichever comes first and install the post and backfill 200 650 min 450 600 rock soil 50 800 min 600 800 rock soil ...

Page 14: ...shop curved to fit any radius from 2 4m to 45m Convex Curves in excess of 45m do not require shop curving as the rail can be field installed to suit Guardrail may be curved either concave or convex to the traffic face and can be part curved along its length to suit site requirements 7 11 1 Measuring Curvature 1 Mark along the arc of the curve at 4m intervals 2 Measure the corresponding chord lengt...

Page 15: ...t such that it reduces the effective operation of the safety barrier or its design life or introduces sharp tearing edges nor shall it cause damage to pavement IftheEzy Carriagecannotfreelymoveas it is attached to the post as a result of deformation of the post during installation then the post shall be replaced The use of a vibrating post hammer will reduce deformation to the top of the post and ...

Page 16: ... to that of the adjacent surface 7 13 Back to BackW Beam Installation The Ezy Guard Smart system can also be used in median applications where the W Beam is installed on both sides of the post This configuration requires a special post with resistance tabs on both sides of the post The installation procedure is the same as for a single sided installation with steps 8 thru 15 repeated on the opposi...

Page 17: ...red W Beam rail has been disassembled 7 Determine the required lift by measuring the height of overlay The nominal W Beam height of Ezy Guard Smart is 730mm 8 Rails are to be re attached to the Ezy Lift carriage using a M16x30mm post bolts and 75x45mm rectangular washer at each post 9 Rails are overlapped so that no leading edge is presented to the traffic face as shown in Figure 18 10 Rails are s...

Page 18: ...rance from design position of rail 25mm post spacing tolerance measured at top of post rail rail Plan View Side View 15mm Front View 15mm 20mm lateral tolerance from design position of rail 25mm post spacing tolerance measured at top of post rail rail Plan View Side View Height 25mm 0mm 15mm Front View 15mm ...

Page 19: ...Yes No Have the rails been spliced observing the correct lap Yes No Have the rails been spliced with M16x32mm mushroom head bolts Yes No Are all splice bolts and post bolts snug tight Yes No Is Ezy Guard Smart appropriately delineated Yes No Is Ezy Guard Smart suitably anchored with approved terminals Yes No Are the cables in the terminals tensioned to their nominated torque Yes No Has any minor d...

Page 20: ...pose steel structures to anairtemperatureof800 Cforperiodsofupto120seconds however zinc coatings are generally reflective and will not absorb heat at the same rate as an uncoated steel surface Depending on the section thickness of the steel the actual steel surface temperature may not exceed 350 C Typically the bushfire flame duration and intensity are not high enough to compromise the structural ...

Page 21: ...21 Release 07 22 20 Release 10 14 ...

Page 22: ...22 Release 07 22 ...

Page 23: ...23 Release 07 22 22 Release 10 14 ...

Page 24: ...24 Release 07 22 ...

Page 25: ...G 5 26 11 2019 PART LIST AND TITLE BLOCK UPDATED VB BS LG 1 01 04 16 TITLE CHANGE LG SE LG 2 10 04 16 TITLE CHANGE LG SE LG 3 03 12 2015 AU REFERENCE REMOVED LG SE LG 4 02 03 2016 FOOTPRINT DIM ADDED LG SE LG KIT EZY GUARD 4 MEDIAN CONFIGURATION ITEM PART DESCRIPTION QTY 1 10007562 MEDIAN Z POST 1650mm GALV DOUBLE NOTCHED 2 2 10000985 W BEAM 3810mm NLL 2 3 10004115 SMART CARRIAGE 4 4 10001832 M16 ...

Page 26: ...26 Release 07 22 ...

Page 27: ...27 Release 07 22 ...

Page 28: ...28 Release 07 22 ...

Page 29: ...29 Release 07 22 ...

Page 30: ...30 Release 07 22 Notes ...

Page 31: ...31 Release 07 22 Notes ...

Page 32: ...ide NT Brisbane Melbourne Newcastle Perth Sydney Wagga Auckland Christchurch Head Office Sydney 57 65 Airds Road Minto NSW 2566 Ph 61 2 9827 3333 Fax 61 2 9827 3300 Local call within Australia 1300 446 425 Email sales ingalcivil com au For more information V 140817 ...

Reviews: