
31
Release 07/19
ET-SS System Test Level 2 (Posts 0-6) – Post Placement Diagram
NOTES:
1. Post 0-6 part of ET-SS System TL2
2. Post 7 is first post of longitudinal w-beam system (not included with ET-SS System)
3 . Spacing between posts is on centre as shown
4 . All ET-SS System posts must be installed plumb
5 . Guardrail splice joint located at Post 7
6. Before installation, ensure the variant of highw ay safety barrier is accepted for use by the final asset owner.
TRAFFIC DIRECTION