www.austin-hughes.com
UM-PPS-02-S-Q421V1
P.3
< 1.2 > IP Dongle Installation & Meter ( PDU ) Cascade
IP Dongle for 1U rackmount PDU
- SNMP capability v2 / v3
Installation steps :
-
fi
x the IP Dongle on the rear side of rackmount PDU with 4 screws
- plug its RJ-45 connector into the LINK port of the 1st level PDU meter
- connect IP Dongle to network device via CAT. 5 / 6 cable
Network Hub
To LAN port
Part no.
IPD-H02-S
To LINK port
of the 1st PDU
Step 3
- In display 9.1, Press the & button to select PDU level no. & press to con
fi
rm
Step 4
- Press to exit
< 1.3 > Meter ( PDU ) Level Setting
Step 1
- Press the & button to display no.9 and press to con
fi
rm
Step 2
- Press the & button to PDU ID and press to con
fi
rm
(
II
) For 2.8
″
LCD Meter ( With touchscreen function )
(
I
) For 1.8
″
LCD Meter ( No touchscreen function )