P a g e
|
1
LT 7941 Issue No 3 (04/22)
Benchmark Scheme
Charlton and Jenrick Ltd is a licensed member of the Benchmark Scheme which aims to
improve the standards of installation and commissioning of domestic heating and hot
water systems in the UK and to encourage regular servicing to optimise safety, efficiency
and performance. Benchmark is managed and promoted by the Heating and Hotwater
Industry Council. For more information and the full code of practice please visit
Please ensure that the installer has fully completed the Benchmark Checklist on the inside
back pages of the installation instructions supplied with the product and that you have
signed it to say that you have received a full and clear explanation of its operation. The
installer is legally required to complete a commissioning checklist as a means of
complying with the appropriate Building Regulations (England and Wales).
All installations must be notified to Local Area Building Control either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be
issued to the customer who should, on receipt, write the Notification Number on the
Benchmark Checklist.
This product should be serviced regularly to optimize its safety, efficiency and
performance. The service engineer should complete the relevant Service Record on the
Benchmark Checklist after each service.
The Benchmark Checklist will be required in the event of any warranty.
It is a requirement that the gas fire is installed and commissioned to the manufacturer’s
instructions and the data fields on the commissioning checklist completed in full.
To instigate the guarantee, the gas fire needs to be registered with the manufacturer
within one month of the installation.
To maintain the guarantee, it is essential that the gas fire is serviced annually by a Gas
Safe registered engineer. The service details should be recorded on the Benchmark
Service Interval Record and left with the householder.
800 HD with UBL USERS INSTRUCTIONS
Summary of Contents for 800 HD UBL
Page 14: ...P a g e 12 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS...
Page 15: ...P a g e 13 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS...
Page 16: ...P a g e 14 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS...
Page 17: ...P a g e 15 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS...
Page 18: ...P a g e 16 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS...
Page 19: ...P a g e 17 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS Silver Birch Fuel Bed...
Page 20: ...P a g e 18 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS...
Page 21: ...P a g e 19 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS...
Page 22: ...P a g e 20 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS...
Page 23: ...P a g e 21 LT 7941 Issue No 3 04 22 800 HD with UBL USERS INSTRUCTIONS...
Page 44: ...P a g e 42 LT 7941 Issue No 3 04 22 800 HD with UBL SERVICE FAULT FINDING INSTRUCTIONS...
Page 45: ...P a g e 43 LT 7941 Issue No 3 04 22 800 HD with UBL SERVICE FAULT FINDING INSTRUCTIONS...
Page 57: ...P a g e 55 LT 7941 Issue No 3 04 22...
Page 58: ...P a g e 56 LT 7941 Issue No 3 04 22...