P a g e
| 32
LT 7602 Issue No2 (07/17)
480 HD INSTALLATION INSTRUCTIONS
Open the aperture size to accommodate the fire box as out lined at the beginning of the
section. With the height of the opening established and support for the fire box in place, take
out a further area of the plaster board lining to expose the inner brick work face of the
chimney breast as out lined in Fig 1.
The exposed area should be 822 mm from the base of the fire and 744 mm in the width. With
the slip bracket attached to the fireplace frame. Secure the fire box back against the inner
brick work face of the chimney breast using rawl plugs and wood screws.
New plaster board can now be fitted to cover the exposed metal work, making sure that no
plaster joints are positioned directly above the unit as highlighted in the Fig 2 above.
C-Wet plaster hole in the wall.
When the chimney breast front has been finished using wet plastered method and the total
thickness of the bonding plus finishing plaster is less than 12mm. The following method will
need to be applied.
Fit the fire box using the guidance stipulated earlier in the section when fitting the fire box
with none combustible slips. With the fire box secured fit 15mm thick plaster board section to
cover the complete front area of the chimney breast up to the forward projected edge of
the firebox frame. Please note avoid any plaster board joints directly above the unit.
Summary of Contents for 480HD
Page 14: ...P a g e 13 LT 7602 Issue No2 07 17 480 HD USERS INSTRUCTIONS...
Page 17: ...P a g e 16 LT 7602 Issue No2 07 17 480 HD USERS INSTRUCTIONS...
Page 21: ...P a g e 20 LT 7602 Issue No2 07 17 480 HD USERS INSTRUCTIONS...
Page 25: ...P a g e 24 LT 7602 Issue No2 07 17 480 HD USERS INSTRUCTIONS...
Page 53: ...P a g e 52 LT 7602 Issue No2 07 17 480 HD SERVICE FAULT FINDING INSTRUCTIONS...
Page 54: ...P a g e 53 LT 7602 Issue No2 07 17 480 HD SERVICE FAULT FINDING INSTRUCTIONS...