3.
Assistance of a second person to hold the glass is
recommended for the activity below. This generally also applies
to the installation of the new pane, in particular when sealing
and fastening the clamp frame with screws.
Example: G200.2_Arbeitsraumtuere_07
Remove the clamping frame (x) of the glass package. Loosen and remove all
screws from the clamping frame (see Fig_07).
4.
Example: G200.2_Arbeitsraumtuere_04
Remove the clamping frame (x) and glass package (y). (See Fig._04)
Maintenance Summary - 8 Years
83
Maintenance Instructions
B500
DIE219EN - 05.06.2019