Transportation, Installation, Commissioning
LL1602.10043 - 04.08.2014
ABC
QUICk START mANUAl fOR TRANSPORT ABC
LL 26 02.1 0013 - 04.08.2014
0814/Pr/Sp
Unloading the machine with a crane
Pos.
No off
Name
Ordering No.
Transporting tackle
1
2
3
4
5
6
7
1
2
1
2
2
12
4
6
6
1
Girder 3t
Sling rope/ Ø12 x 1600
Sling rope/ Ø12 x 1750
Hook
Hook long
Cheese Head Screws M12 x 35 DIN 912-12.9
Retaining eye
plain washer
truss-head screw M16x260 DIN 603
Sling rope/ Ø20 x 1870
208315.1406
208111.1232
208111.1235
208310.4601
208310.4604
410260.1235
208310.4622
419021.16
410986.1660
208111.2037
Fig. 1
L1601.10041_11
1
3
2
4+6
5+6
7
ap
pr
. 2
000
ap
pr.
17
00
6
Attention!
Check the slings/chains for proper attachment in the
transport hooks before lifting the machine. If other ropes
are used for transport than those indicated here, make
sure when lifting the machine that the ropes do not
touch the housing. Transport the machine in horizontal
position only (fig.1).
For transport with a fork-lift truck, the machine must be
placed on planks. For minimum length and spacing of
the prongs, see fig. 2.
The girder and slings/chains neces-
sary for transporting the machine
are supplied with the machine at
extra charge and can be returned
to
INDEX
-works after installation of
the machine.
INDEX ABC
Method of Slinging
Mass of machine
ca. 2900 kg
Mass of tackle,
complete
ca. 75 kg