
6
www.ims-insulation.co.uk
•
Apply the chicken wire over the top of the foil insulation forming it to
follow the shape of the dome and entrance. This is required to allow
the first render coat to hold on to the dome otherwise the material
can slip from the foil making render application difficult.
•
Lay the chicken wire over the dome and cut a hole at the front to
allow the flue to be fitted
•
Pull the chicken wire down around the dome cutting aV-shaped
notch up the back to the top of the dome
•
Twist the cut ends together along each side of the cut to hold the
shape of the chicken wire for later render application
Step 7
•
Lay the metalwork over the top of the Dome & Doorway
•
Leave any plastic coating in place until the application of render,
primer and sand has been completed as this will make cleaning the
construction easier
•
Trim excess chicken wire from around the base of the metal work
Step 8
Piccolo shown
Step 9
Piccolo shown
•
Insert Stainless Steel Flue into opening.
The seamof the flue should face the back of the oven.
Piccolo shown