FUNCTIONAL TRAINER ASSEMBLY INSTRUCTION
Tools Required Assembling the Machine: Crossing Wrench and Allen Wrenches.
NOTE: Two or more people assembling this machine is a must. Do NOT attempt to
assemble this machine alone.
STEP 1 (See Diagram 1)
A.)
Do not tighten the Nuts and Bolts until instructed to so.
B.) Place the Lower Cross Brace (#4) between the Right & Left Stations (#1 & #2) in the mid-
span.
C.) Attach one end of the Lower Cross Brace to the Right Station. Secure it with two M10 x 2
¾” Allen Bolts (#62), four Ø ¾” Washers (#58), and two M10 Aircraft Nuts (#76). Repeat
the same procedure to install the other side.
D.) Repeat Procedure B & C to install the Upper Cross Brace (#83).
E.) Place the Upper Frame (#3) on top of the Right and Left Stations.
F.) Secure each end with two M10 x 1” Allen Bolts (#66), two Ø ¾” Lock Washers (#74), and
Ø ¾” Washers (#58).
G.)
Securely tighten all Nuts and Bolts installed.
5
Summary of Contents for PLATINUM MARCY PM-9150
Page 7: ...DIAGRAM 1 6...
Page 9: ...8...
Page 16: ...14...