STEP 2 (See Diagram 2)
A.) Attach the Upper Frame (#15) onto the two Guide Rods (#16). Secure it with two M10 x
¾” Allen Bolts (#85) and
∅
¾” Washers (#93). DO NOT tighten the Bolts yet.
B.) Place the Upper Frame onto the Vertical Frame (#5). Secure it with two M10 x 2 5/8”
Carriage Bolts (#90), one 2 ¾” x 4 ¾” Bracket (#23), two
∅
¾” Washers (#93), and two
M10 Aircraft Nuts (#92).
C.) Securely tighten all Nuts and Bolts previously installed.
D.) Attach the Stopper Frame (#14) to the Vertical Frame. Secure it with one M10 x 3 ½”
Carriage Bolt (#89),
∅
¾” Washer (#93), and M10 Aircraft Nut (#92).
E.) Attach the Low Pulley Base Frame (#3) to the Main Base Frame (#1). Secure it with two
M10 x 3 ½” Carriage Bolts (#89), one 2” x 5 ½” Bracket (#28), two Ø ¾” Washers (#93),
and two M10 Aircraft Nuts (#92).
9
Summary of Contents for MARCY PLATINUM MP-2500
Page 7: ...HARDWARE PACK 6...
Page 9: ...DIAGRAM 1 8...
Page 17: ...Upper Cable Loop Diagram 16...
Page 19: ...Butterfly Cable Loop Diagram 18...
Page 21: ...DIAGRAM 10 1 20...
Page 22: ...DAIGRAM 10 2 21...
Page 23: ...DAIGRAM 10 3 22...
Page 24: ...Lower Cable Loop Diagram 23...
Page 26: ...DIAGRAM 11 1 DIAGRAM 11 2 25...
Page 27: ...DIAGRAM 11 3 DIAGRAM 11 4 26...