S125E
Operating Manual
18
5.3
Start Up on a Vertical Surface
1. Hang the balancer (1) with the eye screw (3) above the surface to
be treated on a fixing point according to the safety regulations.
2. Connect the machine with the use of the shackle (4) with the
balancer.
3. Before the start up, check that the machine is fixed that in a way
that can only be moved over the working area. (5). If not, change
the hanging point.
4. Please adjust the balancer according to the weight of the machine
at the adjusting point.
The following is shown in previous illustration — "Start Up:"
5. Switch on the filter unit. (See operating instructions of the filter
unit.)
6. Check that the magnetic valve is closed. The lever (1) should be in
the position as shown.
7. Make sure the machine sealings (2) are completely straight on the
surface.
8. To start the wheel, move the switch downward (3) as shown and
push the switch to adjust.
BEWARE: When blasting concrete the abrasive feed valve should only be opened
when the blast-machine is in forward motion! If the machine is at a standstill and the
valve is opened deep grooves are blasted into the concrete surface within seconds.
WARNING: when the blast head is lifted from the floor, abrasive will spurt out of the
sides of the blast head at high speed. If the machine is moved with the blast head
raised, the abrasive feed valve must be fully closed.
The dustbin of the filter unit needs regular dumping. Do not overfill the bin to avoid
dust exposure when opening the bin. Comply with the local waste treatment
regulations when considering the removed material.
Summary of Contents for STREAMER S125E
Page 1: ...Operating Manual S125E Your Partner for Mobile Surface Preparation IMPACTSamericas com...
Page 35: ...Operating Manual S125E 33 10 2 Wheel Drive...
Page 36: ...S125E Operating Manual 34 10 3 Housing Assembly...
Page 37: ...Operating Manual S125E 35 10 4 Valve Actuator Assembly...
Page 38: ...S125E Operating Manual 36 10 5 Base Seal Assembly...
Page 39: ......